Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project
一句话结论
这是一个位于孟加拉国的港口类海外投资项目,当前阶段为在执行,批准金额 7.5 亿美元,批准日期 2022-06-28,由国际多边开发机构提供资金。项目编号 P176549。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 孟加拉国(Bangladesh)
- 行业
- 港口
- 项目阶段
- 在执行
- 批准金额
- 753,450,000 美元(约 7.5 亿美元)
- 批准日期
- 2022-06-28
- 项目编号
- P176549
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of First Phase of the Accelerating Transport and Trade Connectivity in Eastern South Asia Project for Bangladesh is to increase the efficiency and resilience of trade and transport along selected regional corridors in eastern South Asia. This project has three components. 1) The first component, Digital Systems for Trade, aims to support the transformation of the cross-border clearance process through the provision of digital solutions and automation to manage the projected increase in trade. 2) The second component, Green and Resilient Transport and Trade Infrastructure, aims to support green and resilient transport and trade infrastructure development along the corridors that serve as the backbone of the physical and economic integration of eastern South Asia. 3) The third component, Institutional and Policy Strengthening for Transport and Trade, is anchored in the implementation of the World Trade Organization (WTO) Trade Facilitation Agreement (TFA), simplification and harmonization of customs procedures under the World Custom Organization (WCO) Revised Kyoto Convention, and national customs modernization plans.
项目编号 P176549 · 入库编号 5653e7bad9cb
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Chattogram Water Supply Improvement Project | 2.8 亿美元 | 2024-12-19 |
| Health, Nutrition and Population Sector Development Program | 3.8 亿美元 | 2024-12-19 |
| Second Bangladesh Green and Climate Resilient Development Credit | 5.0 亿美元 | 2024-12-19 |
| Bay Terminal Marine Infrastructure Development Project | 6.5 亿美元 | 2024-06-28 |
| Bangladesh Second Recovery and Resilience DPC | 5.0 亿美元 | 2024-06-21 |
同行业其他项目
- Sao Paulo Metro Line 5 Project 2010-04-20
- Cameroon-Chad Transport Corridor 2022-02-15
- DRC Transport and Connectivity Support Project 2022-06-23
- Norte Grande Road Infrastructure 2010-12-20
- Modernization and Restructuring of the Road Sector 2017-04-28
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。