Second Power Transmission Project
一句话结论
这是一个位于乌克兰的能源类海外投资项目,当前阶段为在执行,批准金额 3.3 亿美元,批准日期 2014-12-22,由国际多边开发机构提供资金。项目编号 P146788。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 乌克兰(Ukraine)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 330,000,000 美元(约 3.3 亿美元)
- 批准日期
- 2014-12-22
- 项目编号
- P146788
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Second Power Transmission Project in Ukraine is to improve the reliability of the power transmission system and support the implementation of the Wholesale Electricity Market in Ukraine. The project consists of the following three components and subcomponents: (1) Rehabilitation of Transmission Substations. Replacement of outdated high voltage equipment, installation of gas-insulated switchgears, and replacement of auxiliary power equipment, protective layering and substation control and automation systems in selected high voltage transmission substations. (2) Electricity Market Enhancement. This component consists of four subcomponents: Subcomponent 2.1: Installation and connection of reactive power compensation devices for selected high voltage transmission substations. Subcomponent 2.2: Introduction of Smart Grid through purchase and installation of Smart Grid solutions including: (a) modernization of the telecommunications network between renewable energy sources, key substations of transmission networks and system operator control centers; and (b) modernization of the regional and national system of load distribution and organization of control centers. Subcomponent 2.3: Provision of support to the Balancing Market through purchase and installation of hardware and software for the proper functioning of the Balancing Market of electricity, ancillary services market and fulfillment of administrative settlement services, administration of commercial settlement, as well as other services of the System Operator based on the Electricity Market Law of Ukraine. Subcomponent 2.4: Support for institutional development of the Project Implementing Entity (UE) by: (a) establishing a corporate-wide management information system (MIS) in the Project Implementing Entity; (b) providing technical assistance to the Project Implementing Entity on procurement, financial management and project management; and (c) financing of 9 audits and training.
项目编号 P146788 · 入库编号 5dc73632409a
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Second Growth Foundations Development Policy Operation | — | 2024-12-17 |
| Supporting Reconstruction through Smart Fiscal Governance (SURGE) | 7.5 亿美元 | 2024-11-07 |
| Strengthening Government Capacity for Fiscal Reform Implementation | — | 2024-11-05 |
| Resilient, Inclusive and Sustainable Enterprise Program for Results | 34.3 亿美元 | 2024-10-31 |
| Lifting Education Access and Resilience in times of Need in Ukraine Program | 2200 万美元 | 2024-08-30 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。