这是一个位于赞比亚的能源类海外投资项目,当前阶段为已关闭,批准金额 1.1 亿美元,批准日期 2013-05-30,由国际多边开发机构提供资金。项目编号 P133184。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 赞比亚(Zambia)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 105,000,000 美元(约 1.1 亿美元)
- 批准日期
- 2013-05-30
- 项目编号
- P133184
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Electricity Transmission and Distribution System Rehabilitation Project for Zambia is to increase the capacity and improve the reliability of the electricity transmission and distribution system in the Lusaka area. The project will reinforce and upgrade the power transmission and distribution infrastructure in Lusaka area as a priority to increase the capacity and improve the reliability of the electricity network for consumers throughout the area. This will improve the quality of electricity supply to existing consumers and facilitate the connection of new customers. The project consists of the following three components: (i) rehabilitation of the 132kV and 88kV transmission network in Lusaka Area; (ii) rehabilitation of the 33kV and 11kV distribution network in Lusaka Area; and (iii) technical assistance and project supervision.
项目编号 P133184 · 入库编号 5e663fb05ca4
同国别其他在执行项目
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。