Bamako Urban Resilience Project
一句话结论
这是一个位于马里的灌溉类海外投资项目,当前阶段为在执行,批准金额 2.5 亿美元,批准日期 2022-11-30,由国际多边开发机构提供资金。项目编号 P171658。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 马里(Mali)
- 行业
- 灌溉
- 项目阶段
- 在执行
- 批准金额
- 250,000,000 美元(约 2.5 亿美元)
- 批准日期
- 2022-11-30
- 项目编号
- P171658
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Bamako Urban Resilience Project for Mali is to improve access to urban waste, sanitation, and water services, increase resilience to floods in selected vulnerable areas of the district of Bamako and targeted neighboring communes, and strengthen urban management capacity. The project comprises of six components. The first component, improved solid waste management (SWM) aim to: (a) rehabilitate and expand infrastructure needed to restore primary waste management functions that is, collection, transfer and treatment, performance by strengthening the institutional, and (b) improve the sector’s organizational framework as well as sector financing, which is a requirement to further enhance private sector participation (PSP) and support job creation initiatives along the value chain. It consists of following sub-components: (i) development of SWM infrastructure; and (ii) performance improvement of SWM services. The second component, improved water supply, sanitation, and hygiene (WASH) will address current and future climate vulnerability. It consists of following sub-components: (i) fecal sludge treatment plants; (ii) WASH in schools and health centers, domestic latrines, and behavior change; (iii) strengthening institutional framework of the sanitation sector and capacity building for National Directorate for Sanitation and Control of Pollution and Nuisances (DNACPN) and (National Agency for the Management of Wastewater Plants of Mali (ANGESEM); and (iv) urban water supply. The third component, investments in resilient infrastructure objective is to enhance flood resilience and urban living conditions in selected vulnerable neighborhoods, in turn increasing resilience to Coronavirus disease 2019 (COVID19) compound risks. It consists of following sub-components: (i) investments in drainage infrastructure; (ii) investments in neighborhood upgrading; and (iii) support to local initiatives focusing on urban services and economic inclusion. The fourth component, strengthening institutional capacity will support capacity building to strengthen targeted entities at both local and central levels to enable them to carry out their respective mandates more effectively as part of project implementation, including development of appropriate and sound strategic urban planning as well as administrative, financial, and technical management systems, tools, and capabilities to effectively deliver local services. It consists of following sub-components: (i) support for operationalization of the grand Bamako; (ii) digital platform for resilience - foundation for the urban master plan and local economic development plans; (iii) support urban master plan; and (iv) municipal finance and asset management for service delivery. The fifth component, project coordination unit will finance incremental project management costs, financial and technical audits, monitoring and evaluation (M and E) of project activities (including gender disaggregated data), oversight and implementation of environmental and social safeguards, communication, technical assistance and consultant services, training, and knowledge exchange. The sixth component, contingent emergency response component (CERC) is a zero-assignation CERC that will provide funding for immediate response in the event of an eligible crisis or emergency, defined as an event that has caused or is likely to imminently cause a major adverse economic and or social impact associated with natural or man-made crises or disasters.
项目编号 P171658 · 入库编号 623a58d2a8ef
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Mali Community Resilience and Inclusive Services Project - Malidenko | — | 2024-11-14 |
| Advancing Resilience and Inclusive Health Systems for Everyone (ARISE - KENEYA YIRIWALI) in Mali | — | 2024-06-28 |
| Mali Electricity System Reinforcement and Access Expansion Project (YELEN SIRA) | 1.6 亿美元 | 2023-06-23 |
| Mali Landscape Restoration Project | 1.5 亿美元 | 2023-05-25 |
| Additional Financing-Mali Drylands Development Project | 3000 万美元 | 2022-11-09 |
同行业其他项目
- Food Systems Resilience Program for Eastern and Southern Africa 2022-06-21
- Sindh Flood Emergency Rehabilitation Project 2022-12-19
- Nigeria Erosion and Watershed Management Project 2012-05-08
- Transforming Irrigation Management in Nigeria 2014-06-19
- Water Sector Improvement Project 2010-06-03
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。