DRC Electricity Access & Services Expansion (EASE)
一句话结论
这是一个位于Congo, Democratic Republic of的能源类海外投资项目,当前阶段为已关闭,批准金额 1.4 亿美元,批准日期 2017-05-04,由国际多边开发机构提供资金。项目编号 P156208。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- Congo, Democratic Republic of(Congo, Democratic Republic of)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 145,000,000 美元(约 1.4 亿美元)
- 批准日期
- 2017-05-04
- 项目编号
- P156208
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Electricity Access and Service Expansion Project for Congo, Democratic Republic of is to expand access to electricity in target areas. There are three components to the project, the first component being network upgrades and access expansion in selected SNEL service areas. Component one is aimed at increasing and improving access by addressing critical rehabilitation needs in the SNEL-operated distribution network zones where power is either available from high voltage/medium voltage (MV) substations or can be restored in generation plants. It will target investments identified as ‘priority’ by SNEL in its recovery plan and aligned with the GoDRC’s drive to electrify provincial capitals. This component includes three subcomponents: investments in Kinshasa; Mobayi hydropower plant and Gbadolite distribution network; and technical assistance for SNEL investments. The second component is the private sector based access expansion. This component will promote private sector access expansion. It was conceptualized based on recommendations from a study funded by the Energy Sector Management Assistance Program (ESMAP) that was carried out during project preparation. The study assessed over 30 electricity access subprojects from various developers, identified the most advanced subproject developers, analyzed selected developers’ business plans, and highlighted the financial barriers faced by the private sector to be able to expand electricity access. To address the financing constraints, the component will provide debt and grant support to implement qualifying access subprojects. Early investments are expected to include subprojects under active development by experienced private developers12 that have been identified under the study. The component comprises two subcomponents. The first will develop, and potentially pilot the implementation of a Credit Support Facility (CSF) to provide commercial term financing for commercial investments. The second will set up an Electrification Fund, which will provide connection cost subsidies and grants to address consumer affordability and fill the ‘viability gap’ for near-commercial investments. Further assistance from ESMAP is envisioned to support the development of this component during implementation. Finally, the third component is the sector development and implementation support. The component will contribute to the implementation of key institutional provisions of the 2014 electricity law, critical to expanding private participation in electricity access outside of SNEL’s current service area. It will also serve as a platform for developing follow-on investments, through comprehensive planning and feasibility studies, and provide needed resources for project implementation and monitoring. The component comprises four subcomponents. institutional strengthening, planning and investment development, mid-size hydro feasibility, and project management.
项目编号 P156208 · 入库编号 6330361da40c
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| DRC Digital Transformation Project | 4.0 亿美元 | 2024-06-27 |
| Democratic Republic of Congo Health Emergency Preparedness, Response, and Resilience Project | 2.5 亿美元 | 2024-03-30 |
| Water Supply and Sanitation Access Program (PASEA) Project | 4.0 亿美元 | 2023-06-09 |
| Forest and Savanna Restoration Investment Program | 2.9 亿美元 | 2023-06-02 |
| DRC Girls Learning and Empowerment Project | 4.0 亿美元 | 2023-03-28 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。