LB- GREATER BEIRUT WATER SUPPLY
一句话结论
这是一个位于黎巴嫩的供水类海外投资项目,当前阶段为在执行,批准金额 2.0 亿美元,批准日期 2010-12-16,由国际多边开发机构提供资金。项目编号 P103063。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 黎巴嫩(Lebanon)
- 行业
- 供水
- 项目阶段
- 在执行
- 批准金额
- 200,000,000 美元(约 2.0 亿美元)
- 批准日期
- 2010-12-16
- 项目编号
- P103063
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The project development objective of the Greater Beirut Water Supply Project for Lebanon is to increase the provision of potable water to the residents in the project area within the Greater Beirut region, including those in the low-income neighborhoods of Southern Beirut, and to strengthen the capacity of the Beirut Mount Lebanon Water Establishment in utility operations. There are three components to the project. Component one: bulk water supply infrastructure. Component one will comprise: (a) the construction and construction supervision of bulk water supply infrastructure; (b) design, construction and construction supervision of a water treatment plant (WTP) of 250,000 cubic meters a day capacity; (c) all related equipment including pumps and valves; and (d) support to Council for Development and Reconstruction for project management. Component two: supply reservoirs, distribution network and metering. Component two will comprise: (i) design, construction and construction supervision of 16 supply reservoirs of storage capacities varying between 500 and 1,000 m3 each, dispersed within the project area, and associated pumping stations; (ii) design, construction and construction supervision of water supply distribution network of about 187 km of pipelines across the project area in southern Beirut and parts of the Metn, Baabda and Aley areas; (iii) installation of 200,000 household meters in selected project areas; and (iv) installation of about 30 bulk water meters at reservoirs and distribution chambers. Component three: project management, utility strengthening and national studies. Component three will focus on utility strengthening and will also strengthen the capacity of the Ministry of Energy and Water for project oversight.
项目编号 P103063 · 入库编号 6772acba053b
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Lebanon Renewable Energy and System Reinforcement Project | 2.5 亿美元 | 2024-10-01 |
| Community-based Wildfire Risk Management in Lebanon’s Vulnerable Landscapes | — | 2024-08-27 |
| Support for Social Recovery Needs of Vulnerable Groups Phase II | 560 万美元 | 2024-08-27 |
| Fiscal Management Project | 2850 万美元 | 2024-02-14 |
| Lebanon: Green Agri-food transformation for economic recovery (GATE) | 2.0 亿美元 | 2023-06-28 |
同行业其他项目
- Third National Program for Community Empowerment in Rural Areas (PNPM-Rural 2010-03-30
- Accelerating Reforms for an Inclusive and Resilient Recovery DPF 2 2022-03-16
- Accelerating Reforms for an Inclusive and Resilient Recovery DPF 2021-06-10
- Luanda Bita Water Supply Guarantee Project 2019-07-16
- Rural Water Supply and Sanitation Project for Low Income States 2013-12-30
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。