Third Rwanda Energy Sector Development Policy Operation
一句话结论
这是一个位于卢旺达的能源类海外投资项目,当前阶段为已关闭,批准金额 1.2 亿美元,批准日期 2019-08-29,由国际多边开发机构提供资金。项目编号 P169040。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 卢旺达(Rwanda)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 125,000,000 美元(约 1.2 亿美元)
- 批准日期
- 2019-08-29
- 项目编号
- P169040
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Third Rwanda Energy Sector Development Policy Financing Project for Rwanda is to enable fiscally sustainable expansion of electricity services in Rwanda. The proposed operation is built around two pillars: pillar A contains measures led by the Ministry of Finance and Economic Planning (MINECOFIN) and the Rwanda Utilities Regulatory Authority (RURA) that directly contain the fiscal impact of the power sector, including tariff reforms. Pillar B contains measures led by the Ministry of Infrastructure (MININFRA) and Rwanda Energy Group (REG) that improve the operational efficiency, affordability, and accountability of electricity service, divided into four themes: (a) transitioning Rwanda to a least-cost and low-carbon energy mix; (b) increasing access to affordable and reliable electricity - specifically, the adoption of least-cost principles in the expansion of electricity access; (c) improving the accountability and transparency of REG - specifically, the modernization of REG’s accounting and the publication of its financial statements, which is a critical step toward the listing of Energy Utility Corporation Limited (EUCL) and improving transparency to REG’s balance sheet; and (d) improving the operational efficiency and quality of electricity services, which will lead to lower cost of service and higher revenues.
项目编号 P169040 · 入库编号 68b79b0f96e4
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Boosting Green Finance, Investment and Trade in Rwanda | 2.0 亿美元 | 2024-12-20 |
| Priority Skills for Growth and Youth Empowerment | 2.8 亿美元 | 2024-09-09 |
| Rwanda Health Emergency Preparedness, Response and Resilience Project Using the Multiphase Programmatic Approach | 1.2 亿美元 | 2024-05-24 |
| Rwanda-Emergency Connectivity Restoration Project | 2736 万美元 | 2024-04-25 |
| Kigali Logistics Platform Connectivity Development Project | 1.3 亿美元 | 2024-03-29 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12