中项目网图形标 中项目信息网海内+海外版

Pap-Angren Railway

国别:乌兹别克斯坦行业:铁路 阶段:已关闭 金额:1.9 亿美元 批准:
一句话结论

这是一个位于乌兹别克斯坦的铁路类海外投资项目,当前阶段为已关闭,批准金额 1.9 亿美元,批准日期 2015-02-13,由国际多边开发机构提供资金。项目编号 P146328。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
乌兹别克斯坦(Uzbekistan)
行业
铁路
项目阶段
已关闭
批准金额
195,000,000 美元(约 1.9 亿美元)
批准日期
2015-02-13
项目编号
P146328
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The Pap-Angren Railway Project of Uzbekistan has objectives to reduce transport costs and to increase transport capacity and reliability through the construction of a rail link between the Uzbek part of the Ferghana Valley and the rest of Uzbekistan. The project will be measured through the following PDO indicators: (i) transportation cost for public transport users; (ii) transportation costs for freight for oil and oil products, fertilizers, and automobiles; (iii) transport capacity; and (iv) reliability of rail services. The project consists of six components. Component one consists of the Uzbekistan Temir Yo’llari being responsible for the construction of the new railway line main infrastructure including embankments, ballast, rail, bridges and a 19.2 km long tunnel. Component two will finance four investments to equip and maintain the new railway line: (i) the installation of a microprocessor based train control system (estimated IBRD financing US$48 million); (ii) the construction of two traction substations and the installation of SCADA system (estimated IBRD financing US$30 million); (iii) the provision of necessary track maintenance equipment (estimated IBRD financing US$36 million); (iv) the installation of railway video surveillance and broadcasting system (estimated IBRD financing US$20 million); and a US$20 million contingency added to this component and embedded in the financing of the project to cover for possible change in technologies. Component three will finance three investments to bring energy to the new railway line: (i) the dismantling of overhead power lines (estimated IBRD financing US$2.6 million); (ii) the provision of equipment for the installation of new power lines (estimated IBRD financing US$13.3 million); (iii) the expansion of the Obihayot power substation and the construction of new power distribution lines (estimated IBRD financing US$17.6 million). Component four will provide technical assistance to strengthen (i) UTY’s financial management and asset management capacity; (ii) modernized marketing arrangements; and (iii) capacity development. Component five will further elaborate the analytical work developed during project preparation under ECAPDEV trust fund. Component six will support UTY to monitor the project implementation, including procurement, supervision of the various contracts associated with the construction of the new railway line.

项目编号 P146328 · 入库编号 6cb52cdbc647

同国别其他在执行项目

项目名称金额批准日期
Uzbekistan - Khorezm Solar IPP Project350 万美元2024-12-16
Second Inclusive and Resilient Market Economy Development Policy Operation3.0 亿美元2024-10-03
INnovative SOcial Protection System for inclusiON of Vulnerable People Project1.0 亿美元2024-05-24
Uzbekistan Solar and Renewable Energy Storage Project1200 万美元2024-01-03
First Inclusive and Resilient Market Economy Development Policy Operation8.0 亿美元2023-12-07

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。