Pap-Angren Railway
一句话结论
这是一个位于乌兹别克斯坦的铁路类海外投资项目,当前阶段为已关闭,批准金额 1.9 亿美元,批准日期 2015-02-13,由国际多边开发机构提供资金。项目编号 P146328。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 乌兹别克斯坦(Uzbekistan)
- 行业
- 铁路
- 项目阶段
- 已关闭
- 批准金额
- 195,000,000 美元(约 1.9 亿美元)
- 批准日期
- 2015-02-13
- 项目编号
- P146328
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The Pap-Angren Railway Project of Uzbekistan has objectives to reduce transport costs and to increase transport capacity and reliability through the construction of a rail link between the Uzbek part of the Ferghana Valley and the rest of Uzbekistan. The project will be measured through the following PDO indicators: (i) transportation cost for public transport users; (ii) transportation costs for freight for oil and oil products, fertilizers, and automobiles; (iii) transport capacity; and (iv) reliability of rail services. The project consists of six components. Component one consists of the Uzbekistan Temir Yollari being responsible for the construction of the new railway line main infrastructure including embankments, ballast, rail, bridges and a 19.2 km long tunnel. Component two will finance four investments to equip and maintain the new railway line: (i) the installation of a microprocessor based train control system (estimated IBRD financing US$48 million); (ii) the construction of two traction substations and the installation of SCADA system (estimated IBRD financing US$30 million); (iii) the provision of necessary track maintenance equipment (estimated IBRD financing US$36 million); (iv) the installation of railway video surveillance and broadcasting system (estimated IBRD financing US$20 million); and a US$20 million contingency added to this component and embedded in the financing of the project to cover for possible change in technologies. Component three will finance three investments to bring energy to the new railway line: (i) the dismantling of overhead power lines (estimated IBRD financing US$2.6 million); (ii) the provision of equipment for the installation of new power lines (estimated IBRD financing US$13.3 million); (iii) the expansion of the Obihayot power substation and the construction of new power distribution lines (estimated IBRD financing US$17.6 million). Component four will provide technical assistance to strengthen (i) UTYs financial management and asset management capacity; (ii) modernized marketing arrangements; and (iii) capacity development. Component five will further elaborate the analytical work developed during project preparation under ECAPDEV trust fund. Component six will support UTY to monitor the project implementation, including procurement, supervision of the various contracts associated with the construction of the new railway line.
项目编号 P146328 · 入库编号 6cb52cdbc647
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Uzbekistan - Khorezm Solar IPP Project | 350 万美元 | 2024-12-16 |
| Second Inclusive and Resilient Market Economy Development Policy Operation | 3.0 亿美元 | 2024-10-03 |
| INnovative SOcial Protection System for inclusiON of Vulnerable People Project | 1.0 亿美元 | 2024-05-24 |
| Uzbekistan Solar and Renewable Energy Storage Project | 1200 万美元 | 2024-01-03 |
| First Inclusive and Resilient Market Economy Development Policy Operation | 8.0 亿美元 | 2023-12-07 |
同行业其他项目
- Eastern Dedicated Freight Corridor - II 2014-04-22
- Eastern Dedicated Freight Corridor - I 2011-05-31
- Buenos Aires – Belgrano Sur Passenger Railway Line Modernization Project 2022-05-31
- Upgrading and Greening the Rio de Janeiro Urban Rail System Additional Financing 2012-01-26
- Resilient and Sustainable Infrastructure for Recovery DPF 2020-09-30
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。