IN Uttar Pradesh Water Sector Restructuring Project Phase 2
一句话结论
这是一个位于印度的灌溉类海外投资项目,当前阶段为已关闭,批准金额 3.6 亿美元,批准日期 2013-08-28,由国际多边开发机构提供资金。项目编号 P122770。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 印度(India)
- 行业
- 灌溉
- 项目阶段
- 已关闭
- 批准金额
- 360,000,000 美元(约 3.6 亿美元)
- 批准日期
- 2013-08-28
- 项目编号
- P122770
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Second Phase of the Uttar Pradesh Water Sector Restructuring Project for India is to: (a) strengthen the institutional and policy framework for integrated water resources management for the entire state; and (b) increase agricultural productivity and water productivity by supporting farmers in targeted irrigation areas. There are six components to the project, the first component being strengthening of state-level water institutions and inter-sector coordination. This component aims to provide support to the institutions in the state responsible for overall integrated water resources management and implementation of the state water policy. The second component is the modernization and rehabilitation of irrigation and drainage systems. The third component is the consolidation and enhancement of irrigation institutional reforms. This component will enhance the efficiency of the Uttar Pradesh Irrigation Department (UPID) and strengthen the Participatory Irrigation Management (PIM) approach both in the department as well as in the community. The fourth component is the enhancing agriculture productivity and on-farm water management. This component (to be implemented directly by the Department of Agriculture) aims to improve the overall agriculture productivity and water-use efficiency at the field level. The fifth component is the feasibility studies and preparation activities for the next phase. This component is to prepare detailed surveys and designs for future third phase areas. These new areas will be identified by the Government of Uttar Pradesh and will make use of similar design principles (and the lessons learned) adopted under this second phase operation. Finally, the sixth component is the project coordination and monitoring.
项目编号 P122770 · 入库编号 6cfb93b81f7d
同国别其他在执行项目
同行业其他项目
- Food Systems Resilience Program for Eastern and Southern Africa 2022-06-21
- Sindh Flood Emergency Rehabilitation Project 2022-12-19
- Nigeria Erosion and Watershed Management Project 2012-05-08
- Transforming Irrigation Management in Nigeria 2014-06-19
- Water Sector Improvement Project 2010-06-03
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。