Mali - Economic & Environmental Rehabilitation of the Niger River
一句话结论
这是一个位于马里的供水类海外投资项目,当前阶段为已关闭,批准金额 2780 万美元,批准日期 2018-03-16,由国际多边开发机构提供资金。项目编号 P151909。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 马里(Mali)
- 行业
- 供水
- 项目阶段
- 已关闭
- 批准金额
- 27,800,000 美元(约 2780 万美元)
- 批准日期
- 2018-03-16
- 项目编号
- P151909
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development Economic and Environmental Rehabilitation of the Niger River Project for Mali are to demonstrate the effectiveness of navigation and port service improvement measures, and demonstrate the feasibility of environmental restoration and livelihood improvement activities at targeted sites in the Niger Inner Delta (NID), and, in the event of an Eligible Crisis or Emergency, improve the Recipient’s capacity to respond promptly and effectively to such Eligible Crisis or Emergency. The project has four component. First component, strengthening the strategic management of the Niger river resources improving navigability and socioeconomic viability of activities in the Niger Inner Delta (NID) will depend not only on carrying out works to improve the physical conditions of the river but also the more efficient management of activities, resources, and stakeholders over time and effective monitoring of the ecological functioning of the river. This component will strengthen the monitoring of the ecological functions of the river, particularly in the biodiversity rich area of the NID, through the establishment of an observatory to monitor the ecological functions of the Niger River, as well as through a review of the institutional and regulatory framework for the strategic management and sustainability of the river. This components divided into two sub-component, (i) strengthening the environmental monitoring of the Niger river; (ii) supporting the strategic management of infrastructure, resources, and stakeholders in the NID; Second component, enhancing the viability of socioeconomic activities contributing to climate change resilience the Niger River is the lifeline of socioeconomic activity in the NID. Improving the socioeconomic conditions of the population living in the targeted communes and villages will include investments that are mutually reinforcing: improving navigability and thus the flow of goods and people and improving access to markets in a way that is environmentally sustainable and socially responsible. This component has two sub-component, (i) improving river transportation in the NID through targeted dredging and maintenance of navigation channels; (ii) enhancing the reliability of river transportation through construction/rehabilitation and maintenance of river docking piers infrastructure; (iii) improving socioeconomic opportunities and ecosystem functions of the NID; (iv) protection and rehabilitation of riverbanks and restoration of channels; Third component, project management component will support project planning, monitoring, and implementation. It will finance the operational costs related to the implementation of the project components, including third‐party monitoring and/or execution if required. The component costs also include the refinancing of the project preparation advance (PPA) and the costs associated with additional security provisions on site. The provisions for security arrangements involving third‐party monitoring and implementation, among others, significantly increased the overall costs for project management. This component has three sub-component, (i) operational costs of the ABFN; (ii) equipment and training (from the PPAs); and (iii) contingencies and security arrangements; Fourth component, contingent emergency response component (CERC), will be available should the need arise to redirect resources freed up by a future restructuring of the project or other 国际多边开发机构 projects in the Mali portfolio. Such resources would be made available to finance emergency response activities and to address crisis and emergency needs. An Immediate Response Mechanism Coordinating Agency and expenditure management procedures will be defined in an Immediate Response Mechanism Operational Manual (IRM/OM), to be prepared separately and approved by the 国际多边开发机构, in line with guidance provided under the Investment Project Financing Policy and Directive.
项目编号 P151909 · 入库编号 6ec7e6ee408f
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Mali Community Resilience and Inclusive Services Project - Malidenko | — | 2024-11-14 |
| Advancing Resilience and Inclusive Health Systems for Everyone (ARISE - KENEYA YIRIWALI) in Mali | — | 2024-06-28 |
| Mali Electricity System Reinforcement and Access Expansion Project (YELEN SIRA) | 1.6 亿美元 | 2023-06-23 |
| Mali Landscape Restoration Project | 1.5 亿美元 | 2023-05-25 |
| Bamako Urban Resilience Project | 2.5 亿美元 | 2022-11-30 |
同行业其他项目
- ODRA-VISTULA FLOOD MANAGEMENT PROJECT 2015-07-23
- Disaster Risk Management Development Loan with a CAT DDO 2011-09-13
- Atal Bhujal Yojana (Abhy)-National Groundwater Management Improvement 2018-06-05
- MX DPL Adaptation to Climate Change in the Water Sector 2010-06-10
- Punjab Rural Sustainable Water Supply and Sanitation Project 2021-06-18
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。