中项目网图形标 中项目信息网海内+海外版

Strategic Irrigation Modernization and Urgent Rehabilitation Project

国别:印度尼西亚行业:灌溉 阶段:在执行 金额:2.5 亿美元 批准:
一句话结论

这是一个位于印度尼西亚的灌溉类海外投资项目,当前阶段为在执行,批准金额 2.5 亿美元,批准日期 2018-06-21,由国际多边开发机构提供资金。项目编号 P157585。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
印度尼西亚(Indonesia)
行业
灌溉
项目阶段
在执行
批准金额
250,000,000 美元(约 2.5 亿美元)
批准日期
2018-06-21
项目编号
P157585
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Strategic Irrigation Modernization and Urgent Rehabilitation Project for Indonesia is to improve irrigation services and strengthen accountability of irrigation schemes management in selected areas. There are three components to the project, the first component being urgent rehabilitation of irrigation and drainage system. Urgent Rehabilitation of Irrigation and Drainage System. this component will support the Institutional strengthening and rehabilitation and revitalization of about 100,000 hectares of irrigated command area aligned with the Government’s five pillars of modernization. This includes about 84,000 hectares of gravity upland irrigation systems and 16,000 hectares of tidal gravity lowland systems. The component will include activities as: (i) assessments of water resources and schemes performance, including potential changes due to climate change; (ii) engineering surveys, investigations and designs; and (iii) rehabilitation and upgrading of the irrigation and drainage infrastructure, incorporating climate resilient designs such as incorporating rainfall variability into hydraulic drainage systems. This component includes four subcomponents: improvement and revitalization of irrigation and drainage infrastructure; irrigation management modernization; irrigation management institutions; and human resources development. The second component is the strategic modernization of irrigation and drainage system. This component will support the increase of serviceability and management of 176,000 hectares of main, secondary and tertiary networks in the East (ETC ‐ 90,230 ha) and North (NTC ‐ 85,945 ha) Tarum Canals along with two pilot projects in the ETC command area to pioneer irrigation management modernization principles. The component will also support agricultural services under JIS. This component includes three subcomponents: improvement and modernization of irrigation and drainage infrastructure; modernization of irrigation management in Jatiluhur irrigation system; irrigation management institutions; and human resources development. Finally, the fourth component is the project management. This component will provide support to overall project management and implementation through: (i) the Central Project Management Unit (CPMU) within the Ministry and Project Implementation Units (PIU) at the RBOs to provide the necessary support services for timely and effective project implementation, including monitoring and evaluation, procurement, financial management, safeguard compliance and monitoring; (ii) technical Assistance for the RBOs and other implementing entities to ensure timely and effective implementation; (iii) support to the National Steering Committee for Water Resources; and (iv) the incremental operating costs of the CPMU and the PIUs for activities related to project implementation.

项目编号 P157585 · 入库编号 782436ea4924

同国别其他在执行项目

项目名称金额批准日期
Indonesia Supporting Health Transformation Project (I-SeHat)—2024-11-27
Integrated Land Administration and Spatial Planning Project6.5 亿美元2024-09-30
Technical Assistance Grant to Support SINERGIS Implementation—2024-04-22
Labor Market Information and Skills System Transformation for Labor Market Flexibility1.4 亿美元2024-01-18
Indonesia Health Systems Strengthening Project14.8 亿美元2023-12-08

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。