Comoros Interisland Connectivity Project
一句话结论
这是一个位于科摩罗的港口类海外投资项目,当前阶段为在执行,批准金额 2000 万美元,批准日期 2022-05-20,由国际多边开发机构提供资金。项目编号 P173114。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 科摩罗(Comoros)
- 行业
- 港口
- 项目阶段
- 在执行
- 批准金额
- 20,000,000 美元(约 2000 万美元)
- 批准日期
- 2022-05-20
- 项目编号
- P173114
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Interisland Connectivity Project for Comoros is to improve maritime transport climate resilience between the islands. The project comprises of three components. The first component, improvement of climate resilience of port infrastructure supports strengthening the climate resilience of Port Boingoma through carrying out the design and construction of a breakwater along the north side of both quays to protect against waves from the north. The second component, implementation support and capacity building consist of following sub-components: (i) implementation support; and (ii) capacity building. The third component, contingent emergency response will allow for rapid reallocation of credit and grant uncommitted funds in the event of an eligible emergency as defined in the 国际多边开发机构 Operational Policy 8.00.
项目编号 P173114 · 入库编号 7e22e9f9cd7a
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Comoros National Water Resilience Project | 1500 万美元 | 2024-06-20 |
| Comoros Interisland Connectivity Project SOP2 | 500 万美元 | 2024-03-20 |
| Comoros Interisland Connectivity Project Additional Finance | 1500 万美元 | 2023-05-31 |
| Shock Responsive and Resilient Social Safety Net Project | 3000 万美元 | 2022-12-22 |
| Additional Financing to Support to COVID-19 Vaccine Purchase and Health System Strengthening | 2500 万美元 | 2022-06-23 |
同行业其他项目
- Capacity Augmentation of the National Waterway- 1 (JAL MARG VIKAS) Project 2017-04-12
- Bangladesh Regional Waterway Transport Project 1 2016-06-16
- Dar es Salaam Maritime Gateway Project 2017-06-30
- GREATER ABIDJAN PORT - CITY INTEGRATION PROJECT 2018-06-29
- Mekong Delta Transport Infrastructure Development Project - Additional Financing 2013-01-29
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。