Bangladesh Regional Waterway Transport Project 1
一句话结论
这是一个位于孟加拉国的港口类海外投资项目,当前阶段为在执行,批准金额 3.6 亿美元,批准日期 2016-06-16,由国际多边开发机构提供资金。项目编号 P154511。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 孟加拉国(Bangladesh)
- 行业
- 港口
- 项目阶段
- 在执行
- 批准金额
- 360,000,000 美元(约 3.6 亿美元)
- 批准日期
- 2016-06-16
- 项目编号
- P154511
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the First Regional Waterway Transport Project for Bangladesh is to improve Inland Water Transport (IWT) efficiency and safety for passengers and cargo along the Chittagong-Dhaka-Ashuganj Regional Corridor and to enhance sector sustainability. The Project consists of three components as follows: 1) Improved inland waterway navigation include work to guarantee advertised depths and widths of navigation channels on select river routes. The work also includes provision of aids to navigation. The work is to be done on a Performance-based Contracting (PBC) method designed to increase the efficiency and effectiveness of river asset management and maintenance. It is designed to ensure that the physical condition of the rivers under contract are adequate for the need of river users, over the entire period of the contract which is six to seven years; 2) Improved services at priority inland waterway terminals and landing stations supports the development of two cargo terminals, four passenger terminalsand 14 landing stations (or ghats). The development of passenger and cargo terminals are within existing inland waterway port areas under the jurisdiction of BIWTA. It includes the modernization and extension of existing facilities to cater for increased demand; 3) Institutional capacity development and sector sustainability will support Bangladesh Inland Water Transport Authority's (BIWTA) overall enhancement of its management systems and human resources capacity for modern, efficient, and high quality management of the IWT sector in line with international standards, and to help BIWTA achieve long-term operational and financial sustainability, and enhance the climate resilience of the IWT sector.
项目编号 P154511 · 入库编号 83b85a5655c2
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Chattogram Water Supply Improvement Project | 2.8 亿美元 | 2024-12-19 |
| Health, Nutrition and Population Sector Development Program | 3.8 亿美元 | 2024-12-19 |
| Second Bangladesh Green and Climate Resilient Development Credit | 5.0 亿美元 | 2024-12-19 |
| Bay Terminal Marine Infrastructure Development Project | 6.5 亿美元 | 2024-06-28 |
| Bangladesh Second Recovery and Resilience DPC | 5.0 亿美元 | 2024-06-21 |
同行业其他项目
- Capacity Augmentation of the National Waterway- 1 (JAL MARG VIKAS) Project 2017-04-12
- Dar es Salaam Maritime Gateway Project 2017-06-30
- GREATER ABIDJAN PORT - CITY INTEGRATION PROJECT 2018-06-29
- Mekong Delta Transport Infrastructure Development Project - Additional Financing 2013-01-29
- China: Hubei Inland Waterway Improvement Project 2018-05-18
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。