ZhangHu Railway
一句话结论
这是一个位于中国的铁路类海外投资项目,当前阶段为已关闭,批准金额 2.0 亿美元,批准日期 2012-03-15,由国际多边开发机构提供资金。项目编号 P122319。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 中国(China)
- 行业
- 铁路
- 项目阶段
- 已关闭
- 批准金额
- 200,000,000 美元(约 2.0 亿美元)
- 批准日期
- 2012-03-15
- 项目编号
- P122319
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Zhangjiakou Hohhot (ZhangHu) Railway Project for China is to improve accessibility and mobility by responding to existing and anticipated transport demand along the Hohhot-Zhangjiakou (to Beijing) corridor through the provision of additional railway capacity and reduction of transport time for passengers and freight. There are three components to the project. The first component support the construction of a 286 km-long double-track, electrified, passenger-dedicated high-speed rail line between the northern cities of Zhangjiakou and Hohhot, including construction, renovation or rehabilitation of three stations, acquisition and installation of goods, maintenance equipment, and rolling stock, as well as land acquisition and resettlement. Of the six stations on this line, three new railway stations will be constructed, two existing stations renovated, and one existing station used. This railway line is an extension of the planned high-speed Intercity Beijing-Zhangjiakou Railway. The second component will finance the procurement of goods associated with the construction of the line and with its electrification, signaling, and communication systems, as well as operation and maintenance equipment and possibly technical assistance on policy aspects. The scope of such technical assistance (consultant services, training, and study tours) will be identified during implementation. The third component will begin in the second half of 2012. The construction period is expected to be 4 years with construction planned to begin in June 2013 and the line opened to traffic in June 2017.
项目编号 P122319 · 入库编号 855ca7056f12
同国别其他在执行项目
同行业其他项目
- Eastern Dedicated Freight Corridor - II 2014-04-22
- Eastern Dedicated Freight Corridor - I 2011-05-31
- Buenos Aires – Belgrano Sur Passenger Railway Line Modernization Project 2022-05-31
- Upgrading and Greening the Rio de Janeiro Urban Rail System Additional Financing 2012-01-26
- Resilient and Sustainable Infrastructure for Recovery DPF 2020-09-30
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。