Regional Electricity Access and BEST Project
一句话结论
这是一个位于西部与中部非洲的能源类海外投资项目,当前阶段为在执行,批准金额 4.7 亿美元,批准日期 2021-06-10,由国际多边开发机构提供资金。项目编号 P167569。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 西部与中部非洲(Western and Central Africa)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 465,000,000 美元(约 4.7 亿美元)
- 批准日期
- 2021-06-10
- 项目编号
- P167569
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Regional Electricity Access and Battery Energy Storage Technology (BEST) Project for Cote d’Ivoire, Mali, Mauritania, Niger, Senegal, and the Economic Community of West African States (ECOWAS) is to increase access to grid electricity, enhance power system stability, and increase renewable energy integration in the West Africa power pool (WAPP). The project comprises of four components. The first component, design, supply, and installation of electricity distribution infrastructure specifically supports the detailed design, supply, and installation of distribution networks from the WAPP 225/33-kV substations. The second component, design, supply, and installation of battery energy storage technology (BEST) equipment involves the supply and installation of a 205-MWh BEST to provide frequency control to the WAPP power system. The third component, supervision of the construction and technical advisory will finance the costs associated with the recruitment of the two owner’s engineers who will be recruited on a competitive basis under the project to supervise the work carried out under component 1 and component 2. The fourth component, project coordination and technical assistance will finance a combination of technical assistance and project management support to assist Recipients in successfully implementing the project and preparing for future energy access phases under the program. It consists of following sub-components: (i) regional implementation support; and (ii) national implementation support.
项目编号 P167569 · 入库编号 8d3576c0f601
同国别其他在执行项目
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。