Strengthening Critical Infrastructure against Natural Hazards
一句话结论
这是一个位于塔吉克斯坦的灌溉类海外投资项目,当前阶段为已关闭,批准金额 5000 万美元,批准日期 2017-07-10,由国际多边开发机构提供资金。项目编号 P158298。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 塔吉克斯坦(Tajikistan)
- 行业
- 灌溉
- 项目阶段
- 已关闭
- 批准金额
- 50,000,000 美元(约 5000 万美元)
- 批准日期
- 2017-07-10
- 项目编号
- P158298
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Strengthening Critical Infrastructure Against Natural Hazards Project for Tajikistan are to strengthen the recipient's disaster risk management capacities, enhance the resilience of its critical infrastructure against natural hazards, and improve its capacity to respond to disasters. There are four components to the project, the first component being strengthening disaster risk management capacity. This component is intended to strengthen the GoT’s capacity for DRM through selected activities that focus on disaster risk identification, disaster preparedness, and financial protection against disasters. It will be implemented in coordination with UNDP, which has been continuously strengthening the capacities of the CoESCD at the national and regional levels, while building regional mechanisms for disaster risk management and mainstreaming disaster risk reduction into state policy at the national and subnational levels. The second component is the making critical infrastructure resilient against natural hazards. This component will finance capital works and contingency planning (for example, equipment for emergency situations) for the transportation network in GBAO, which suffered the most significant damage in July 2015, as well as the flood protection infrastructure that has repeatedly been damaged in the Khatlon Oblast. The third component is the contingent emergency response component. The objective of this component is to enhance Tajikistan’s capacity to respond to disasters. An emergency eligible for financing is an event that has caused, or is likely imminently to cause, a major adverse economic and/or social impact to the Borrower, associated with a disaster. Finally, the fourth component is the project management.
项目编号 P158298 · 入库编号 8fa7181dd2f1
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Tajikistan Digital Foundations Project | — | 2024-12-17 |
| Sustainable Financing for Rogun Hydropower Project | 3.5 亿美元 | 2024-12-17 |
| Tajikistan Millati Solim Project | 4000 万美元 | 2023-10-24 |
| Financial and Private Sector Development Project | 5000 万美元 | 2023-07-10 |
| Social Protection Modernization and Economic Inclusion Project | 3500 万美元 | 2023-03-24 |
同行业其他项目
- Food Systems Resilience Program for Eastern and Southern Africa 2022-06-21
- Sindh Flood Emergency Rehabilitation Project 2022-12-19
- Nigeria Erosion and Watershed Management Project 2012-05-08
- Transforming Irrigation Management in Nigeria 2014-06-19
- Water Sector Improvement Project 2010-06-03
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。