一句话结论
这是一个位于西部与中部非洲的能源类海外投资项目,当前阶段为已关闭,批准金额 1.8 亿美元,批准日期 2012-05-31,由国际多边开发机构提供资金。项目编号 P113266。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 西部与中部非洲(Western and Central Africa)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 176,000,000 美元(约 1.8 亿美元)
- 批准日期
- 2012-05-31
- 项目编号
- P113266
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The overall developmental objective of the West Africa Power Pool Fourth Adaptable Program Loan (WAPP APL4) for First Phase of the Cote d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development Project is to increase access to electricity supply to Liberia and Guinea through power provided in the medium to long term from the exploitation of viable indigenous generation resources in accordance with a least-cost plan, but obtained in the near-term from Cote d'Ivoire and commercial mining operations in the area. There are two components to the project. The first component of the project is the West Africa Power Pool (WAPP) Cote d'Ivoire, Sierra Leone, Liberia, and Guinea (CLSG) power interconnection project. The second component of the project is the WAPP integration and technical assistance project.
项目编号 P113266 · 入库编号 91f9352e5db6
同国别其他在执行项目
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。