这是一个位于印度的能源类海外投资项目,当前阶段为在执行,批准金额 1.4 亿美元,批准日期 2021-11-29,由国际多边开发机构提供资金。项目编号 P170590。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 印度(India)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 135,000,000 美元(约 1.4 亿美元)
- 批准日期
- 2021-11-29
- 项目编号
- P170590
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Electricity Distribution Grid Modernization Project for India is to improve the operational efficiency and reliability of electricity supply in selected areas of West Bengal. The project comprises of four components. The first component, distribution system strengthening will support strengthening and augmentation of the distribution network in select districts and towns through investments inter alia in: (i) high-voltage distribution system and aerial bunched cabling, (ii) investments in 33-11 kV gas insulated substations, and (iii) underground cabling to replace overhead networks. The second component, smart grid development in urban areas will support investments in smart-grid technologies through investments in: (i) the information and communication technology (ICT) systems of the West Bengal State Electricity Distribution Company Limited (WBSEDCL) through technology and capacity upgrades; (ii) deployment of distribution automation technologies and integration of communicable control devices with supervisory control and data acquisition (SCADA) including investments in geographic information system (GIS) upgradation and integration; and (iii) deployment of smart consumer meters in select urban geographies. The third component, technical assistance for institutional development and capacity building of WBSEDCL will support: (i) strengthening of ICT-OT systems of WBSEDCL for integration of its various technologies including its upgradation, and (ii) strengthening the capacity building of WBSEDCL through personnel planning, business process reengineering, the hiring of project management consultant PMCs), and provision of training and workshops and knowledge exchange visits. The fourth component, contingent emergency response part will support provision of immediate response to an eligible crisis or emergency.
项目编号 P170590 · 入库编号 9266b3c8717c
同国别其他在执行项目
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。