一句话结论
这是一个位于塞内加尔的能源类海外投资项目,当前阶段为已关闭,批准金额 8500 万美元,批准日期 2012-07-26,由国际多边开发机构提供资金。项目编号 P125565。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 塞内加尔(Senegal)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 85,000,000 美元(约 8500 万美元)
- 批准日期
- 2012-07-26
- 项目编号
- P125565
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The main development objectives of the Electricity Sector Support Project (ESSP) are to contribute to: (1) reducing National Power Utility of Senegal (SENELEC's) technical and commercial losses; and (2) improving the reliability of electricity services in selected areas focusing primarily on Greater Dakar. There are four components to the project. The first component of the project is upgrading and modernization of the transmission and distribution network. The upgrading and modernization of the transmission and distribution network component includes: (i) the upgrading, rehabilitation or replacement of existing transmission lines and substations in the Interconnected Network of the Client's territory; (ii) the upgrading of the distribution network from 6.6 kV to 30kV from at least two selected substations in Greater Dakar; (iii) the installation of at least 15 remotely controlled Medium Voltage/Low Voltage (MV/LV) distribution substations in Greater Dakar, (iv) the extension and densification of the distribution network in Greater Dakar, and (v) the extension of the Interconnected Network to reach isolated secondary consumption centers of the Client's territory. The second component of the project is improving SENELEC's commercial performance. This component aims at improving SENELEC's commercial performance by reducing the cost of billing, increasing bill collection and reducing non-technical losses through fraud reduction. This component includes: (i) the installation of about 150,000 STS compliant Split Pre-paid Meters in the Client's territory, (ii) the installation of about 10,000 electronic Smart Meters and of a remote meter reading system in the Client's territory, and (iii) the installation of a new electricity customer management system for SENELEC. The third component of the project is long term strategic outlook. This component aims at carrying out studies designed to assist the Client in developing long term strategy for its energy sector, regarding: (i) energy diversification; (ii) private sector participation in the energy sector; (iii) strengthening of the energy sector's governance, efficiency, transparency and accountability; and (iv) SENELEC's financial restructuring and electricity tariff review. The third component of the project is project implementation, communication, and monitoring and evaluation. This component will provide financing for project coordination, supervision, financial management, communication and outreach, procurement, supervision of implementation of the Safeguard Instruments, monitoring and evaluation of the Project, including through the provision of technical assistance, training, goods and audit services.
项目编号 P125565 · 入库编号 944814a662c0
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Senegal: Integrated Water Security and Sanitation Project | 2.0 亿美元 | 2024-06-21 |
| AF for Municipal and Agglomerations Support Program | 5000 万美元 | 2024-06-21 |
| SENEGAL HIGHER EDUCATION PROJECT - ESPOIR-JEUNES | 1.5 亿美元 | 2023-06-29 |
| Additional Financing for Stormwater Management and Climate Change Adaptation Project 2 | 1.4 亿美元 | 2023-06-29 |
| Additional Financing of Enhancing Connectivity in the northern and central agricultural production areas of Senegal | 1.2 亿美元 | 2023-06-05 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。