中项目网图形标 中项目信息网海内+海外版

Xinjiang Turfan Water Conservation Project

国别:中国行业:灌溉 阶段:已关闭 金额:1.0 亿美元 批准:
一句话结论

这是一个位于中国的灌溉类海外投资项目,当前阶段为已关闭,批准金额 1.0 亿美元,批准日期 2010-06-17,由国际多边开发机构提供资金。项目编号 P111163。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
中国(China)
行业
灌溉
项目阶段
已关闭
批准金额
100,000,000 美元(约 1.0 亿美元)
批准日期
2010-06-17
项目编号
P111163
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Xinjiang Turfan Water Conservation Project for China is to mitigate the risk of flooding, reduce groundwater overdraft, increase industrial and domestic water supply, and raise farmers' income from irrigated agriculture in the arid Turpan basin of Xinjiang Uyghur autonomous region. There are five components to the project, the first component being Evapotranspiration (ET), based integrated water management in the Turpan Basin. With the aim of facilitating the prefecture government's decision to improve water allocation in the Turpan Basin and reduce groundwater overdraft, an innovative integrated basin-wide water management program will be developed and applied that closely links targets for consumptive use of water at the basin-level with the respective targets for consumptive use of water at the county, township, and water users association (WUA) levels. The second component is the increase of upstream storage capacity. This component include: construction of the Alagou dam; the Meiyaogou dam; and the Ertanggou dam. The third component is the real water savings in irrigated agriculture. Carrying out of irrigation management measures in the Turpan River Basin including inter alia: (i) engineering measures such as construction or rehabilitation of the main canals delivering water from the three new reservoirs to water users downstream, a switch from furrow to drip irrigation, land leveling, canal lining, and improved drainage; (ii) agronomic measures such as cropping pattern changes, plant breeding, soil fertility and fertilization, soil salinity control, plastic-culture with mulching, tunnels and greenhouses, and tillage and weed control; and (iii) other irrigation management measures such as irrigation scheduling, volumetric water charges, increase of water charges, and the conjunctive use of surface and groundwater. The fourth component is the preservation of a Karez system. Finally, the fifth component is the institutional capacity building and project management.

项目编号 P111163 · 入库编号 a454558c9528

同国别其他在执行项目

项目名称金额批准日期
Shaanxi Energy Transition and Innovation Demonstration in the Heating Sector3.0 亿美元2024-06-28
Sustainable Fodder Production and Low Methane Livestock Development Program-for-Results2.0 亿美元2024-06-27
Low Carbon Transition of Urban Mobility in Yichang (Hubei)2.5 亿美元2024-05-31
China: Yellow River Basin Ecological Protection and Environmental Pollution Control Program (Gansu and Shandong)3.0 亿美元2024-03-29
Methane-Reducing and Water-Saving Paddy Rice Program for Results (Hunan)2.5 亿美元2023-05-31

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。