Dhaka Sanitation Improvement Project
一句话结论
这是一个位于孟加拉国的环境卫生类海外投资项目,当前阶段为在执行,批准金额 1.7 亿美元,批准日期 2020-03-20,由国际多边开发机构提供资金。项目编号 P161432。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 孟加拉国(Bangladesh)
- 行业
- 环境卫生
- 项目阶段
- 在执行
- 批准金额
- 170,000,000 美元(约 1.7 亿美元)
- 批准日期
- 2020-03-20
- 项目编号
- P161432
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Dhaka Sanitation Improvement Project for Bangladesh is to increase access to safely managed sanitation services in select areas of Dhaka City and to improve Dhaka Water Supply and Sewerage Authority’s (DWASA’s) efficiency in sanitation service delivery. The Project has five components. 1. Institutional Support for Sanitation Service Delivery component builds on the Sanitation Master Plan, organizational diagnostic, and further preparatory assessments. 1.1. Support for establishment of a strengthened sanitation function in the DWASA’s organizational structure and training and capacity building subcomponent will support operational and financial strengthening of DWASA. 1.2. Support to commercial and financial strengthening activities for sanitation functions of DWASA, including development of a tariff framework to incrementally cover operation and maintenance (O and M) costs subcomponent will provide support for: (a) Development and implementation of a sewer connection strategy and plan; (b) Tariff framework rationalization; (c) Improved commercial management for improving DWASA’s billing systems; (d) Other suggested areas of improvement. 1.3. Engagement with citizens including the low-income communities and female-headed households for improved water, sanitation, and hygiene (WASH) practices and climate adaptation; mobilizing households to connect to sanitation systems; improved customer orientation and improved grievance redress; and communications strategy and citizens’ engagement subcomponent will strengthen services for customers, low-income communities (LICs), excluded households, and female-headed households. 1.4. Technical assistance for exploring feasibility of advanced financing options in future infrastructure provisions for DWASA subcomponent will include a study of financing options such as Build-Operate-Transfer (BOT), Design-Build-Operate-Transfer, and so on for DWASA in the future. 1.5. Coordination with other stakeholders including technical assistance to address coordination issues on sanitation between DWASA, the Dhaka City Corporations (DCCs), the Department of Environment (DoE), RAJUK (Capital Development Authority), and other agencies subcomponent will include technical assistance to address coordination issues on sanitation between DWASA and the DCCs. 2. Sewerage and Wastewater Treatment component has the following subcomponents: Subcomponent 2.1. Provision of support for rehabilitation, replacement of sewerage and reactivation/new construction of sewer connections; Subcomponent 2.2. Support the replacement and/or rehabilitation of Eastern and Western Trunk Mains using a Design-Build approach; Subcomponent 2.3. Support the construction of a new Pagla Sewage Treatment Plant at the existing treatment site; Subcomponent 2.4. Support finalization of feasibility studies, engineering designs and bidding documents for priority sewerage and wastewater treatment interventions in the Uttara catchment. 3. Alternative Sanitation component will include: Subcomponent 3.1. Improve sanitation and septage management within Pagla catchment, through upgradation of unimproved toilets of poor households through the support of select non-governmental organizations; Subcomponent 3.2. Provision and installation of demonstration units for alternative sanitation solutions viz. supporting pilot demonstrations of Decentralized Wastewater Treatment Systems (DEWATS), communal septic tanks; Subcomponent 3.3. Provision of services involving septage emptying, transport and treatment, including leasing of emptying and transport equipment to private operators. 4. Project Implementation and Management Support component will support DWASA in coordinating and implementing project activities, complying with the 国际多边开发机构 fiduciary procedures and safeguards. 5. Contingent Emergency Response component will allow for rapid reallocation of loan proceeds from other project components during an emergency.
项目编号 P161432 · 入库编号 a58217f80ce0
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Chattogram Water Supply Improvement Project | 2.8 亿美元 | 2024-12-19 |
| Health, Nutrition and Population Sector Development Program | 3.8 亿美元 | 2024-12-19 |
| Second Bangladesh Green and Climate Resilient Development Credit | 5.0 亿美元 | 2024-12-19 |
| Bay Terminal Marine Infrastructure Development Project | 6.5 亿美元 | 2024-06-28 |
| Bangladesh Second Recovery and Resilience DPC | 5.0 亿美元 | 2024-06-21 |
同行业其他项目
- IN National Ganga River Basin Project 2011-05-31
- Sustainable Rural Sanitation Services Program for Results 2015-07-28
- Second Ho Chi Minh City Environmental Sanitation Project 2014-12-23
- Second Ethiopia Urban Water Supply and Sanitation Project 2017-03-31
- Tamil Nadu Climate Resilient Urban Development Program 2023-12-21
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。