BD Rural Water Supply and Sanitation Project
一句话结论
这是一个位于孟加拉国的供水类海外投资项目,当前阶段为已关闭,批准金额 7500 万美元,批准日期 2012-03-22,由国际多边开发机构提供资金。项目编号 P122269。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 孟加拉国(Bangladesh)
- 行业
- 供水
- 项目阶段
- 已关闭
- 批准金额
- 75,000,000 美元(约 7500 万美元)
- 批准日期
- 2012-03-22
- 项目编号
- P122269
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Rural Water Supply and Sanitation Project for Bangladesh is to: (a) increase provision of safe water supply and hygienic sanitation in the rural areas of Bangladesh, where shallow aquifers are highly contaminated by arsenic and other pollutants such as salinity, iron, and bacterial pathogens; and (b) facilitate early emergency response. There are five components to the project, the first component being rural piped water supply schemes. This component will be implemented in approximately 125 locations and is intended to further develop the public-private participation model for the construction and management of rural piped water schemes in areas where shallow tube-wells are highly affected by arsenic contamination, salinity, iron, and a low water table. The second component is the rural non-piped water supply. This component builds on the successful experience of non-piped rural water supply schemes implemented under the Bangladesh Water Supply Program Project (BWSPP) and the Bangladesh Arsenic Mitigation Water Supply Project (BAMWSP). The component will target unions with severe shortages of safe water supplies, and those with water quality problems, that is, shallow aquifer contamination with a population density that may preclude private sector interest in the provision of piped water supply. The third component is the capacity strengthening and technical assistance. This component will provide technical assistance and support in a number of areas to improve implementation activities. It also will build a knowledge base by carrying out analytical reviews and assessments of the institutional framework for service provision schemes/models supported by the project. The fourth component is the project management and support. Finally, the fifth component is the contingency for disaster risk response. This component will support preparedness and rapid response to disaster, emergency, and/or catastrophic events, as needed. The provisional zero cost for this component will allow for rapid reallocation of credit proceeds from other components under streamlined procurement and disbursement procedures.
项目编号 P122269 · 入库编号 a903b953800c
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Chattogram Water Supply Improvement Project | 2.8 亿美元 | 2024-12-19 |
| Health, Nutrition and Population Sector Development Program | 3.8 亿美元 | 2024-12-19 |
| Second Bangladesh Green and Climate Resilient Development Credit | 5.0 亿美元 | 2024-12-19 |
| Bay Terminal Marine Infrastructure Development Project | 6.5 亿美元 | 2024-06-28 |
| Bangladesh Second Recovery and Resilience DPC | 5.0 亿美元 | 2024-06-21 |
同行业其他项目
- Third National Program for Community Empowerment in Rural Areas (PNPM-Rural 2010-03-30
- Accelerating Reforms for an Inclusive and Resilient Recovery DPF 2 2022-03-16
- Accelerating Reforms for an Inclusive and Resilient Recovery DPF 2021-06-10
- Luanda Bita Water Supply Guarantee Project 2019-07-16
- Rural Water Supply and Sanitation Project for Low Income States 2013-12-30
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。