一句话结论
这是一个位于尼泊尔的道路类海外投资项目,当前阶段为已关闭,批准金额 1.3 亿美元,批准日期 2018-09-26,由国际多边开发机构提供资金。项目编号 P161929。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 尼泊尔(Nepal)
- 行业
- 道路
- 项目阶段
- 已关闭
- 批准金额
- 133,000,000 美元(约 1.3 亿美元)
- 批准日期
- 2018-09-26
- 项目编号
- P161929
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Second Bridges Improvement and Maintenance Program for Nepal is to provide safe, resilient, and cost‐effective bridges on Nepal’s Strategic Roads Network. The proposed operation is designed as a ‘hybrid’ operation, which includes both Program‐for‐Results (PforR) and Investment Project Financing (IPF) components.Developing and/or maintaining bridge infrastructure in the Strategic Roads Network under the Bridge Branch, as set forth in the Bridge Policy and Strategy, including: (a) providing road safety upgrades on existing bridges; (b) constructing new bridges; (c) completing bridges under construction; (d) major bridge maintenance; and (e) carrying out bridge designs, site assessments, feasibility studies, quality monitoring,environmental and social impact management, and providing logistics support, for the Program, as required for the preparation and supervision of civil works.This IPF Component: Consultancy Support and Institutional Development will support the following: (a) provision of consultancy support and institutional development to the Recipient to prepare Potential Future Projects within the Strategic Roads Network, such as, including but not limited to, preparation of baseline assessments, engineering studies, feasibility studies, safeguard assessments and technical designs; (b) carrying out technical audits through the National Vigilance Center, identifying instances where implementation of works deviates from expected technical and process‐related standards or specifications; (c) developing advanced bridge designs to: (i) enhance resilience to extreme weather or seismic events; and (ii) include pedestrians’ and cyclists’ access; (d) Provision of Training to develop the DOR staff and other stakeholders’ technical, social, environmental and fiduciary capabilities; (e) strengthening the institutional capacity of the Bridge Branch for the carrying out of supervision and oversight activities on the Strategic Roads Network under the Operation; (f) mobilizing, equipping and developing the Design and Advanced Technology Cell; (g) improving DOR’s occupational and community health and safety practices and its capacity to implement the Labor Act; (h) verification activities support. (i) collecting data for the impact evaluation of the Program.
项目编号 P161929 · 入库编号 ad06b1240c4d
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| NEPAL SECOND GREEN, RESILIENT, AND INCLUSIVE PROGRAMMATIC DEVELOPMENT POLICY CREDIT | 1.0 亿美元 | 2024-12-12 |
| Nepal Disaster Resilience Development Policy Credit with Cat DDO (NDRC) | 1.5 亿美元 | 2024-10-08 |
| Nepal Finance for Growth DPC (3 of 3) | 8000 万美元 | 2024-05-06 |
| Second Fiscal Policy for Growth, Recovery and Resilience Development Policy Credit | 1.0 亿美元 | 2024-02-29 |
| Provincial and Local Roads Improvement Program - Phase 1 | 1.0 亿美元 | 2024-02-29 |
同行业其他项目
- PMGSY Rural Roads Project 2010-12-20
- Bangladesh Padma Multipurpose Bridge Project 2011-02-24
- East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - 1b) 2012-05-01
- Center West Regional Development Corridor 2016-06-09
- Horn of Africa Gateway Development Project 2020-09-08
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。