中项目网图形标 中项目信息网海内+海外版

Second Bridges Improvement and Maintenance Program

国别:尼泊尔行业:道路 阶段:已关闭 金额:1.3 亿美元 批准:
一句话结论

这是一个位于尼泊尔的道路类海外投资项目,当前阶段为已关闭,批准金额 1.3 亿美元,批准日期 2018-09-26,由国际多边开发机构提供资金。项目编号 P161929。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
尼泊尔(Nepal)
行业
道路
项目阶段
已关闭
批准金额
133,000,000 美元(约 1.3 亿美元)
批准日期
2018-09-26
项目编号
P161929
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Second Bridges Improvement and Maintenance Program for Nepal is to provide safe, resilient, and cost‐effective bridges on Nepal’s Strategic Roads Network. The proposed operation is designed as a ‘hybrid’ operation, which includes both Program‐for‐Results (PforR) and Investment Project Financing (IPF) components.Developing and/or maintaining bridge infrastructure in the Strategic Roads Network under the Bridge Branch, as set forth in the Bridge Policy and Strategy, including: (a) providing road safety upgrades on existing bridges; (b) constructing new bridges; (c) completing bridges under construction; (d) major bridge maintenance; and (e) carrying out bridge designs, site assessments, feasibility studies, quality monitoring,environmental and social impact management, and providing logistics support, for the Program, as required for the preparation and supervision of civil works.This IPF Component: Consultancy Support and Institutional Development will support the following: (a) provision of consultancy support and institutional development to the Recipient to prepare Potential Future Projects within the Strategic Roads Network, such as, including but not limited to, preparation of baseline assessments, engineering studies, feasibility studies, safeguard assessments and technical designs; (b) carrying out technical audits through the National Vigilance Center, identifying instances where implementation of works deviates from expected technical and process‐related standards or specifications; (c) developing advanced bridge designs to: (i) enhance resilience to extreme weather or seismic events; and (ii) include pedestrians’ and cyclists’ access; (d) Provision of Training to develop the DOR staff and other stakeholders’ technical, social, environmental and fiduciary capabilities; (e) strengthening the institutional capacity of the Bridge Branch for the carrying out of supervision and oversight activities on the Strategic Roads Network under the Operation; (f) mobilizing, equipping and developing the Design and Advanced Technology Cell; (g) improving DOR’s occupational and community health and safety practices and its capacity to implement the Labor Act; (h) verification activities support. (i) collecting data for the impact evaluation of the Program.

项目编号 P161929 · 入库编号 ad06b1240c4d

同国别其他在执行项目

项目名称金额批准日期
NEPAL SECOND GREEN, RESILIENT, AND INCLUSIVE PROGRAMMATIC DEVELOPMENT POLICY CREDIT1.0 亿美元2024-12-12
Nepal Disaster Resilience Development Policy Credit with Cat DDO (NDRC)1.5 亿美元2024-10-08
Nepal Finance for Growth DPC (3 of 3)8000 万美元2024-05-06
Second Fiscal Policy for Growth, Recovery and Resilience Development Policy Credit1.0 亿美元2024-02-29
Provincial and Local Roads Improvement Program - Phase 11.0 亿美元2024-02-29

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。