Power Grid Improvement Project

国别:老挝行业:能源 阶段:已关闭 金额:3000 万美元 批准:
一句话结论

这是一个位于老挝的能源类海外投资项目,当前阶段为已关闭,批准金额 3000 万美元,批准日期 2015-06-23,由国际多边开发机构提供资金。项目编号 P149599。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
老挝(Lao People's Democratic Republic)
行业
能源
项目阶段
已关闭
批准金额
30,000,000 美元(约 3000 万美元)
批准日期
2015-06-23
项目编号
P149599
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Power Grid Improvement Project for Lao People's Democratic Republic is to help improve efficiency and reliability of power distribution in the selected load areas served by Electricite du Laos (EDL). There are four components to the project, the first component being smart metering, distribution improvement and distribution losses reduction. This component will support rehabilitation; improvement and automation of power distribution and metering infrastructure and equipment in the selected load areas to introduce smart metering improve the reliability of power supply and reduce distribution losses. The component is expected to introduce advanced metering infrastructure (AMI) technology and digital meters in the project area. The second component is the electric utility information system. This component has three sub-components that will support: (i) the development of an improved information system of EDL, including supply and installation of optical fiber communication links to support advanced metering and distribution automation; (ii) extension of the geographic information system to support power distribution operation and maintenance; and (iii) supply and installation of an updated corporate financial management information system. The third component is the Institutional capacity building and project implementation support. This component will provide technical and operational assistance to enhance EDL’s institutional capacity to utilize new technologies in addressing distribution losses and improving power grid efficiency, and to carry out the day-to-day management, monitoring and evaluation of project activities, including audits. Finally, the fourth component is the contingent emergency response. This component will provide immediate response to an eligible crisis or emergency, as needed. The objective of the contingent emergency response component with a provisional zero allocation is to allow for the reallocation of financing in accordance with the International Development Association (IDA) Immediate Response Mechanism in order to provide a rapid response to disaster or emergency events.

项目编号 P149599 · 入库编号 ad4438c77380

同国别其他在执行项目

项目名称金额批准日期
Lao PDR Climate Resilient Road Connectivity Improvement Project5600 万美元2024-09-30
Lao Health and Nutrition Services Access Project II3900 万美元2024-02-21
Reducing Rural Poverty and Malnutrition Project II (RRPM II)3700 万美元2023-11-30
Community Livelihood Enhancement And Resilience4500 万美元2023-06-15
Power Distribution Improvement Project5100 万美元2023-06-01

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。