中项目网图形标 中项目信息网海内+海外版

Network Reinforcement and Access Project

国别:斯威士兰行业:能源 阶段:在执行 金额:4000 万美元 批准:
一句话结论

这是一个位于斯威士兰的能源类海外投资项目,当前阶段为在执行,批准金额 4000 万美元,批准日期 2019-06-27,由国际多边开发机构提供资金。项目编号 P166170。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
斯威士兰(Eswatini)
行业
能源
项目阶段
在执行
批准金额
40,000,000 美元(约 4000 万美元)
批准日期
2019-06-27
项目编号
P166170
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of Network Reinforcement and Access Project for Eswatini is to improve the reliability of electricity supply and increase access to electricity services in targeted areas of the borrower. The project has four components. (1) Reinforcement of the transmission and distribution grid component will finance the construction of 87 km of 132 kV transmission line from Nhlangano II to Lavumisa with two new 20 MVA 132/11 kV substations at Matsanjeni and Lavumisa, and expansion works at the existing 132/66/11k V Nhlangano II substation, and the 11k V Hluthi switching station that will be converted into a 20 MVA 132/11 kV substation. It also will improve reliability of the distribution network in the Shiselweni region and align the distribution network with present and projected electricity demand. (2) Electricity access expansion component will support GoKE’s program for rural electrification by financing an estimated 8,000 household connections through the REP. The component will be implemented by EEC’s REU and shall target the Shiselweni region and will fund all costs up to the customer interface unit including the necessary MV and low voltage (11 kV and 0.4 kV) network, service drops, meters and circuit breakers for group schemes approved by MNRE. The REP supports group scheme applications and available funding has been insufficient to keep pace with the number of applications for support being received. (3) Analytical support and capacity building component will finance technical assistance to: (a) enhance electrification planning, implementation, monitoring, and verification capacity at the MNRE, considering the GoKE’s stated goal of reaching universal access in the short term; and (b) support the implementation of the GoKE’s policy positions as stated in NEP (2018) in general and specifically maximizing financing for development by enabling greater private sector participation in renewable energy generation and off-grid electrification. This component will also finance technical assistance to enhance the security of supply and support MNRE’s capacity-building needs. (4) Contingent emergency response component support GoKE’s response in the event of an eligible emergency. This responds to a request by GoKE that the 国际多边开发机构’s portfolio enhances Eswatini’s capability to respond to emergencies with major adverse economic and/or social impact.

项目编号 P166170 · 入库编号 b743a1121db9

同国别其他在执行项目

项目名称金额批准日期
Strengthening Early Childhood Development and Basic Education Systems to Support Human Capital Development in Eswatini Project2735 万美元2022-05-02
Additional Financing Eswatini COVID-19 Emergency Response Project500 万美元2021-04-16
Health System Strengthening for Human Capital Development in Eswatini2000 万美元2020-06-22
Eswatini COVID-19 Emergency Response Project600 万美元2020-04-20
Kingdom of Eswatini: Water Supply and Sanitation Access Project4500 万美元2019-10-10

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。