一句话结论
这是一个位于圣多美和普林西比的能源类海外投资项目,当前阶段为在执行,批准金额 1600 万美元,批准日期 2016-07-05,由国际多边开发机构提供资金。项目编号 P157096。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 圣多美和普林西比(Sao Tome and Principe)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 16,000,000 美元(约 1600 万美元)
- 批准日期
- 2016-07-05
- 项目编号
- P157096
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Power Sector Recovery Project for Sao Tome and Principe are to (i) increase renewable energy generation and (ii) improve the reliability of the electricity supply. There are four components to the project, the first component being support for electricity institutional reform and sector planning. This component will finance a combination of capacity building, action plans, road maps, and studies that will: (a) strengthen the capacity of the regulatory agency, and (b) ensure planning of optimum investments needed to develop the power sector in Sao Tome and Príncipe, from electricity generation to the effective connection of end users. Subcomponents include the following: reinforcement of the power sector regulatory agency; development of an integrated least cost power development plan; electricity demand forecast for Sao Tomé and Príncipe; and tariff study. The second component is the strengthening the operational performance and governance of EMAE. This component will comprise the preparation and endorsement of a Management Improvement Plan (MIP) for EMAE for a three-year period, focused on improving efficiency, transparency, and accountability of EMAE’s performance in the key operational areas of electricity supply, commercial functions, and management of corporate resources, with specific emphasis on better service quality and nontechnical loss reduction. The third component is the investing in enhanced reliability of electricity generation, transmission, and distribution. This component will finance priority investments in the rehabilitation and potential expansion of the Contador small hydropower plant, the rehabilitation of the Contador evacuation line and medium voltage (MV) network, and the upgrading of existing low voltage (LV) network in selected districts of the country. Finally, the fourth component is the project implementation support. This component will finance project implementation support, including training for staff in AFAP, the project implementing agency, on procurement and fiduciary duties. Technical training, in particular on O&M issues, will be provided to EMAE technical staff supervising project implementation.
项目编号 P157096 · 入库编号 bfeae542be56
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Safeguarding Access to Fiscal and Educational Resources Project | — | 2024-07-30 |
| Coastal Resilience and Sustainable Tourism Project | 1440 万美元 | 2024-04-12 |
| Access to Clean Resilient Electricity under the ASCENT Regional Program - Multi Programmatic Approach (MPA) | 3800 万美元 | 2023-11-28 |
| Third Additional Financing to STP COVID-19 Emergency Response Project | 150 万美元 | 2023-08-31 |
| Third COVID-19 Recovery and Resilience Development Policy Financing | 1500 万美元 | 2023-08-29 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。