一句话结论
这是一个位于西部与中部非洲的能源类海外投资项目,当前阶段为在执行,批准金额 2.2 亿美元,批准日期 2018-12-13,由国际多边开发机构提供资金。项目编号 P164044。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 西部与中部非洲(Western and Central Africa)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 225,000,000 美元(约 2.2 亿美元)
- 批准日期
- 2018-12-13
- 项目编号
- P164044
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the First Phase of Economic Community of West African States (ECOWAS) Regional Electricity Access Project for Western Africa is to increase grid electricity access in the Republic of Guinea-Bissau, the Republic of Mali, and the Republic of The Gambia. There are three components to the project, the first component being Design, supply, and installation (DSI) of electricity distribution infrastructure to maximize new connections. This component specifically supports: (a) the detailed design, supply, and installation of distribution networks through the construction of approximately 3,900 km of 33 kilovolt (KV) MV lines, approximately 1,060 33KV/400 volt(V) distribution substations, and approximately 3,700 km of 400 V LV lines to expand grid coverage and maximize the number of new connections; and (b) the supply and installation of last mile connection equipment, including service drops, smart meters for large consumers, prepaid meters, and ready boards for LV customers in each country and street lighting, all through the financing of non-consulting services, equipment and consulting services. The second component is the supervision of the construction and technical advisory services under component one of the project. This component will finance the costs associated with the recruitment of an Owner’s Engineer who will be recruited on a competitive basis under the project to supervise the work carried out under component one. The Owner’s Engineer will also monitor compliance with safeguard instruments (environmental and social) related to construction. Finally, the third component is the project coordination and technical assistance. In the spirit of strengthening national and regional capacities, this component will finance a combination of technical assistance and project management support to assist recipients in successfully implementing the project and preparing for future phases under the program. Specifically, this component will finance the strengthening of recipient implementation teams responsible for project implementation, expected project costs associated with the management of safeguards excluding the resettlement costs, and technical advisory services pertaining to preparation studies, such as least-cost electricity access development plans, for future projects in the region. The component will include two subcomponents: regional implementation support, and national implementation support.
项目编号 P164044 · 入库编号 c3fe8e074835
同国别其他在执行项目
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12