中项目网图形标 中项目信息网海内+海外版

Mumbai Urban Transport Project-2A

国别:印度行业:铁路 阶段:已关闭 金额:4.3 亿美元 批准:
一句话结论

这是一个位于印度的铁路类海外投资项目,当前阶段为已关闭,批准金额 4.3 亿美元,批准日期 2010-06-29,由国际多边开发机构提供资金。项目编号 P113028。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
印度(India)
行业
铁路
项目阶段
已关闭
批准金额
430,000,000 美元(约 4.3 亿美元)
批准日期
2010-06-29
项目编号
P113028
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Second Phase (A) of the Mumbai Urban Transport Project (MUTP-2) for India is to improve the passenger carrying capacity, operational efficiency, level of comfort of, and the institutional capacity of entities involved in, the suburban rail system of Mumbai Metropolitan area. There are four components to the project, the first component being Electric Multiple Unit (EMU) rolling stock fleet increase. Under the project 864 additional EMU cars will be procured. This will increase the total fleet to around 3,124 cars. The Bank loan will finance the electrical equipment for the new cars, to be manufactured at Chennai Integral Coach Factory (ICF), while counterpart funds will cover the remaining costs of production. The second component is the conversion of power supply from direct current to alternating current (including Improvements to signals and telecoms). Three sections of the Mumbai Metropolitan Region (MMR) Central Railway network will be converted from 1,500V DC traction to 25KV AC. This activity comprises: (i) modifying overhead catenaries, (ii) installing power sub-stations, along with switching stations (iii) procuring catenary maintenance equipment; and (iv) modifying signal and telecom systems. The third component is the EMU maintenance facilities and stabling lines. New stabling lines will be built to accommodate the additional trains supplied under the project. The existing EMU maintenance depot at Kurla on the Central Railway and the maintenance shed at Virar built under MUTP-1 will accommodate the new stabling lines. No new car maintenance shed or overhaul workshop is planned under MUTP-2A. In total, 73 new stabling lines will be built: 34 (including four extensions from 9-car to 12-car) on the Western Railway and 39 on the Central Railway. They will be fully funded by the government. Finally, the fourth component is the capacity strengthening and technical assistance.

项目编号 P113028 · 入库编号 c4e0c6afefd1

同国别其他在执行项目

项目名称金额批准日期
Amaravati Integrated Urban Development Program—2024-12-19
Uttar Pradesh Agriculture Growth and Rural Enterprise Ecosystem Strengthening Project3.3 亿美元2024-12-12
Maharashtra Strengthening Institutional Capabilities in Districts for Enabling Growth Operation1.9 亿美元2024-12-03
Enhancing Landscape and Ecosystem Management (ELEMENT) Project2.3 亿美元2024-11-25
Kerala Climate Resilient Agri- Value Chain Modernization (KERA) Project2.0 亿美元2024-10-31

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。