PK-Sindh Barrages Improvement Project
一句话结论
这是一个位于巴基斯坦的灌溉类海外投资项目,当前阶段为在执行,批准金额 1.9 亿美元,批准日期 2015-06-19,由国际多边开发机构提供资金。项目编号 P131324。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 巴基斯坦(Pakistan)
- 行业
- 灌溉
- 项目阶段
- 在执行
- 批准金额
- 188,000,000 美元(约 1.9 亿美元)
- 批准日期
- 2015-06-19
- 项目编号
- P131324
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Sindh Barrages Improvement Project for Pakistan are to improve the reliability and safety of the Guddu barrage and strengthen the Sindh Irrigation Department’s capacity to operate and manage the barrage. There are three components to the project, the first component being rehabilitation of the Guddu barrage. This component will support rehabilitation of the barrage and its associated structures. The component will finance: concrete repairs along the upstream gate grooves and rehabilitation of both fish ladders; removal of the left pocket dividing wall and construction of a new left pocket dividing wall to widen the left pocket and improve its ability to reduce the quantities of sediment entering the Ghotki feeder canal; and river training works through construction of a left-bank spur to promote favorable river approach conditions to the barrage and strengthen the upstream existing river training works. The second component is the improved barrage operation. This component will support the establishment of the BMO and modernization and improvements to the barrage O&M. Institutionally this will include undertaking a study to design the BMO structure, defining roles and responsibilities, and moving towards a more service oriented culture. Technically the Bank will finance necessary upgrades to the monitoring instrumentation, such as piezometers, gate positioning and water measurement equipment, replacement of surveillance and maintenance boats, and procurement of hydrographic equipment. The project will support workshops and provide a stock of spare parts, for use in maintenance activities. The instrument monitoring system for the barrage will be renovated, and the operations staff will be equipped with an updated operation, maintenance, and surveillance manual. Finally, the third component is the project management, monitoring, and evaluation. This component will support the coordination of all project-related activities as well as training and technical assistance in procurement, financial, social and environmental safeguards, and communication. This component will also finance the independent Panel of Experts (POE), who will review, monitor, evaluate, and help guide the rehabilitation process with regards to the safety of the barrage.
项目编号 P131324 · 入库编号 c9e1438f7528
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Second Karachi Water and Sewerage Services Improvement Project (KWSSIP-2) | 2.4 亿美元 | 2024-12-12 |
| Sindh Livestock and Aquaculture Sectors Transformation Project | 1.4 亿美元 | 2024-06-20 |
| Crisis-Resilient Social Protection - Additional Financing | 4.0 亿美元 | 2024-06-20 |
| Getting Results: Access and Delivery of Quality Education Services in Punjab Project | 1.5 亿美元 | 2024-06-14 |
| Second Additional Financing for Dasu Hydropower Stage I Project | 10.0 亿美元 | 2024-06-10 |
同行业其他项目
- Food Systems Resilience Program for Eastern and Southern Africa 2022-06-21
- Sindh Flood Emergency Rehabilitation Project 2022-12-19
- Nigeria Erosion and Watershed Management Project 2012-05-08
- Transforming Irrigation Management in Nigeria 2014-06-19
- Water Sector Improvement Project 2010-06-03
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。