国别:突尼斯行业:道路 阶段:已关闭 金额:2.0 亿美元 批准:
一句话结论

这是一个位于突尼斯的道路类海外投资项目,当前阶段为已关闭,批准金额 2.0 亿美元,批准日期 2015-07-14,由国际多边开发机构提供资金。项目编号 P146502。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
突尼斯(Tunisia)
行业
道路
项目阶段
已关闭
批准金额
200,000,000 美元(约 2.0 亿美元)
批准日期
2015-07-14
项目编号
P146502
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objectives of the Road Transport Corridors Project for Tunisia are: (i) to reduce transportation cost and time and improve road safety on select road corridors between lagging regions and more developed areas in the territory of Tunisia; and (ii) to strengthen the capacity of the Ministry of Equipment, Habitat and Land Planning in road asset management. There are two components to the project, the first component being road corridor improvement. The project will improve about 146 km of existing single lane national and regional road sections on three road corridors. Civil works will include widening and upgrading of the road sections when necessary, upgrading of 17 bridges and improvement of 230 culverts, 52 road intersections, traffic signs and installation of other road safety devices. This component includes four sub-components: widening and upgrading as necessary of about 57 km of National Road 12 between Sousse and Kairouan, including the upgrading of bridges, the improvement of culverts, intersections, and traffic signs, and the installation of road safety devices; widening and upgrading as necessary of about 65 km of National Road 4 between El Fahs and Siliana, including the upgrading of bridges, the improvement of culverts, intersections, and traffic signs, and the installation of road safety devices; widening and upgrading as necessary of about 24 km of Regional Road 133 between Jebel El Oust and Zaghouan, including the upgrading of bridges, the improvement of culverts, intersections, and traffic signs, and the installation of road safety devices; and supervision of the activities to be carried out under sub-components 1.1, 1.2, and 1.3 above (financed entirely by the Borrower). Finally, the second component is the road network management improvement.

项目编号 P146502 · 入库编号 caefe8972e59

同国别其他在执行项目

项目名称金额批准日期
Second Additional Financing to Tunisia Emergency Food Security Response Project3.0 亿美元2024-03-14
Tunisia Economic Development Corridor Project2.2 亿美元2024-03-14
Tunisia-Italy Electricity Integration and Renewable Energy Ecosystem2.7 亿美元2023-06-21
Support to Small and Medium Enterprises for Economic Recovery Project1.2 亿美元2023-02-06
Tunisia Sanitation PPP Support Project1.1 亿美元2022-12-19

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。