中项目网图形标 中项目信息网海内+海外版

Bangladesh Municipal Water Supply and Sanitation Project

国别:孟加拉国行业:供水 阶段:在执行 金额:1.0 亿美元 批准:
一句话结论

这是一个位于孟加拉国的供水类海外投资项目,当前阶段为在执行,批准金额 1.0 亿美元,批准日期 2019-07-11,由国际多边开发机构提供资金。项目编号 P161227。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
孟加拉国(Bangladesh)
行业
供水
项目阶段
在执行
批准金额
100,000,000 美元(约 1.0 亿美元)
批准日期
2019-07-11
项目编号
P161227
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of Municipal Water Supply and Sanitation Project for Bangladesh is to increase access to improved water supply and sanitation services in selected municipalities, and strengthen the municipalities’ institutional capacities for delivering water and sanitation services. This project has five components. 1) The first component, Sector Support and Capacity Strengthening, comprises three subcomponents as follows: (i) Strengthening institutional capacity of municipalities to manage WSS through the provision of support to participating municipalities; (ii) Providing support for institutional and operational sustainability; and (iii) Strengthening DPHE for water and sanitation sector roles through the financing of consultancies that will assist DPHE. 2) The second component, Investment for Water Supply Infrastructure, has the following two subcomponents: (i) providing infrastructure investments for the installation of piped water supply systems in each participating municipality; and (ii) establishing an immediate response system to enable the participating municipalities to repair their WSS system and/or avoid deterioration to cope with disasters and climate-induced emergencies. 3) The third component, Improving Sanitation and Drainage, comprises the following subcomponents: (i) Improving sanitation and septage management; (ii) improving drainage, including financing investments in critical drainage infrastructure to manage grey-water and storm water flooding in those participating municipalities that show progress in implementation of water supply schemes. 4) The fourth component, Project Implementation and Management Support, aims to support key project management activities to enable the DPHE in coordinating and implementing project activities at the national and local levels, complying with the Association’s fiduciary procedures and safeguards. 5) The fifth component, - Contingent Emergency Response, aims to l allow for rapid reallocation of loan proceeds from other project components during an emergency, under streamlined procurement and disbursement procedures.

项目编号 P161227 · 入库编号 d6635695042d

同国别其他在执行项目

项目名称金额批准日期
Chattogram Water Supply Improvement Project2.8 亿美元2024-12-19
Health, Nutrition and Population Sector Development Program3.8 亿美元2024-12-19
Second Bangladesh Green and Climate Resilient Development Credit5.0 亿美元2024-12-19
Bay Terminal Marine Infrastructure Development Project6.5 亿美元2024-06-28
Bangladesh Second Recovery and Resilience DPC5.0 亿美元2024-06-21

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。