Karachi Mobility Project
一句话结论
这是一个位于巴基斯坦的港口类海外投资项目,当前阶段为在执行,批准金额 3.8 亿美元,批准日期 2019-06-27,由国际多边开发机构提供资金。项目编号 P166732。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 巴基斯坦(Pakistan)
- 行业
- 港口
- 项目阶段
- 在执行
- 批准金额
- 382,000,000 美元(约 3.8 亿美元)
- 批准日期
- 2019-06-27
- 项目编号
- P166732
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Karachi Mobility Project for Pakistan is to improve mobility, accessibility, and safety along selected corridors in Karachi. The project comprises of three components. The first component, urban road infrastructure - yellow corridor includes: (a) rehabilitating or reconstructing road infrastructure (including improving and shifting related utilities such as street lighting, sewer or water supply, drainage, oil pipeline), bridges and non-motorized transport facilities (such as motorcycle lanes, footpaths, and pedestrian crossing) along the yellow corridor and its direct and feeder service routes; (b) implementing environmental and social recommendations and mitigation measures before and during construction; and (c) carrying out detailed designs, construction supervision activities and third-party monitoring. The second component, the development and operationalization of a bus rapid transit (BRT) system - yellow corridor includes: (a) constructing and equipping bus rapid transit facilities (including segregated busways, interchange facilities, stations, terminal, and depots) along the yellow corridor; (b) providing working capital subsidy for the concession of the BRT operation for the yellow corridor; (c) implementing social management and impact mitigation measures including the labor redeployment for the affected existing bus operators such as drivers, conductors, and route managers; (d) implementing and monitoring the social management plan including its actions to mitigate gender based violence and actions to improve women’s mobility and economic participation options; (e) designing a transit-oriented development strategy for the yellow corridor; (f) providing public private partnership (PPP) transaction advisory services for BRT operation concession; and (g) carrying out a program of regular engagement with key stakeholders; and implementing a public relations and media strategy to generate support for and disseminate information on the BRT system. The third component, capacity building and technical assistance includes: (a) supporting project management and providing technical assistance for the implementation of social measures; (b) provision of technical assistance in traffic management and road safety; (c) supporting the regional transport authorities in automating the management and monitoring of bus route permits; and (d) carrying out capacity building activities to strengthen Sindh Mass Transit Authority (SMTA) and support the consolidation and improvement of the management of the urban transport sector in Karachi.
项目编号 P166732 · 入库编号 db4276585ab1
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Second Karachi Water and Sewerage Services Improvement Project (KWSSIP-2) | 2.4 亿美元 | 2024-12-12 |
| Sindh Livestock and Aquaculture Sectors Transformation Project | 1.4 亿美元 | 2024-06-20 |
| Crisis-Resilient Social Protection - Additional Financing | 4.0 亿美元 | 2024-06-20 |
| Getting Results: Access and Delivery of Quality Education Services in Punjab Project | 1.5 亿美元 | 2024-06-14 |
| Second Additional Financing for Dasu Hydropower Stage I Project | 10.0 亿美元 | 2024-06-10 |
同行业其他项目
- Dar es Salaam Urban Transport Improvement Project 2017-03-08
- Douala Urban Mobility Project 2022-06-02
- Support to the National Urban Transit Program Project 2011-07-21
- Central Africa Regional Waterways Project 2023-06-29
- Abidjan Urban Mobility Project 2019-06-27
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。