Central Africa Regional Waterways Project
一句话结论
这是一个位于Central Africa的港口类海外投资项目,当前阶段为在执行,批准金额 3.3 亿美元,批准日期 2023-06-29,由国际多边开发机构提供资金。项目编号 P175235。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- Central Africa(Central Africa)
- 行业
- 港口
- 项目阶段
- 在执行
- 批准金额
- 330,000,000 美元(约 3.3 亿美元)
- 批准日期
- 2023-06-29
- 项目编号
- P175235
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Central Africa Regional Waterways Project for Central African Republic (CAR), Republic of Congo (ROC) of is to enhance transport and trade efficiency, infrastructure climate-resilience, and socio-economic inclusion, along the selected waterway and road corridor sections between CAR and ROC. The project comprises of five components. The first component, waterways, ports, and road infrastructure improvement consist of following sub-components: (i) Congo-Ubangi waterways improvement investments; (ii) Congo-Ubangi ports infrastructure improvement investments; (iii) key road infrastructure investment and asset preservation in CAR; and (iv) digital connectivity along the road in CAR. The second component, support for waterway and road sectors governance and trade facilitation consists of following sub-components: (i) technical assistance (TA) on trade facilitation for enhanced efficiency; (ii) TA to economic interest group for common waterways maintenance (GIE-SCEVN) for improved waterways maintenance capacity; (iii) TA to International Commission of the Congo-Ubangi-Sangha Basin (CICOS) for improved water resources and waterways management; and (iv) TA for enhanced climate resilience, navigability, road and river transport safety, port and waterway security, and road and port asset management. The third component, socially-inclusive investments and capacity building for riparian communities consists of following sub-components: (i) community-level infrastructure works; and (ii) capacity building for local traders. The fourth component, project management, implementation support, and institutional strengthening consists of following sub-components: (i) project management and operating costs; (ii) resettlement costs; and (iii) institutional strengthening. The fifth component, contingent emergency response (CERC) can be activated in CAR and in ROC to provide support for an immediate response to an eligible crisis or emergency as needed.
项目编号 P175235 · 入库编号 f0f3a0baa6a1
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|
同行业其他项目
- Dar es Salaam Urban Transport Improvement Project 2017-03-08
- Douala Urban Mobility Project 2022-06-02
- Karachi Mobility Project 2019-06-27
- Support to the National Urban Transit Program Project 2011-07-21
- Abidjan Urban Mobility Project 2019-06-27
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。