Moldova Power System Development Project
一句话结论
这是一个位于摩尔多瓦的能源类海外投资项目,当前阶段为在执行,批准金额 7000 万美元,批准日期 2019-05-08,由国际多边开发机构提供资金。项目编号 P160829。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 摩尔多瓦(Moldova)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 70,000,000 美元(约 7000 万美元)
- 批准日期
- 2019-05-08
- 项目编号
- P160829
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Power System Development Project is to increase capacity and improve reliability of the power transmission system in Moldova. There are four components to the project, the first component being construction of Vulcanesti‐Chisinau overhead line. This component will support domestic transmission network reinforcement that will enable the effective operation of cross‐border interconnection between Moldova and Romania. The component will finance the construction of a new 400 kV Vulcanesti - Chisinau single circuit OHTL (approximately 158 km). The new 400 kV Vulcanesti‐Chisinau line is necessary to satisfy the N‐1 contingency criteria, but also enable stable operation of the proposed BtB station. The second component is the extension of two existing substations. This component consisting of: (i) upgrade of 330 kV Chisinau SS; and (ii) extension of 400 kV Vulcanesti SS. The upgrade and extension of the two existing SSs at Vulcanesti and Chisinau are necessary to accommodate the new 400 kV OHTL. To allow the connection of the new 400 kV OHTL to Chisinau SS, which does not have 400 kV level, three single‐phase 400/330 kV auto‐transformers with an installed capacity of 210 MVA each (630 MVA in total) will be installed within the existing substation area. The third component is the strengthening of power dispatch and metering system. This component will finance: (i) upgrade of ME’s supervisory control and data acquisition system and energy management system (SCADA/EMS); (ii) upgrade of ME’s Meter Management System (MMS); (iii) construction of a new headquarters (HQ) building for ME to accommodate the new Central Dispatch Center (CDC); and (iv) consulting services for technical specifications for SCADA/EMS and MMS. Finally, the fourth component is the technical assistance and project management. This component will finance: (i) project management; (ii) environmental audit of Polychlorinated Biphenyl (PCB) pollution at Vulcanesti SS; (iii) capacity building and training to MEPIU and ME; and (iii) ME and project’s accounts’ audit (for five years). The detailed scope of the component will be agreed during the project implementation.
项目编号 P160829 · 入库编号 e08fd7745359
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Strengthening Moldova's Disaster Risk Management and Resilience Project | 4000 万美元 | 2024-09-05 |
| Sustainable Transition through Energy Efficiency in Moldova Project (STEEM) | 5000 万美元 | 2024-06-25 |
| Moldova Supporting Growth and Resilience DPO | 4000 万美元 | 2024-06-14 |
| Moldova Rural Connectivity Project | 1.1 亿美元 | 2024-04-29 |
| Modernization and Improvement of Rehabilitation Services Project | 4000 万美元 | 2024-03-05 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。