中项目网图形标 中项目信息网海内+海外版

Rail Logistics Improvement Project

国别:土耳其行业:铁路 阶段:在执行 金额:3.5 亿美元 批准:
一句话结论

这是一个位于土耳其的铁路类海外投资项目,当前阶段为在执行,批准金额 3.5 亿美元,批准日期 2020-06-30,由国际多边开发机构提供资金。项目编号 P170532。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
土耳其(Turkiye)
行业
铁路
项目阶段
在执行
批准金额
350,000,000 美元(约 3.5 亿美元)
批准日期
2020-06-30
项目编号
P170532
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Rail Logistics Improvement Project for Turkey is to reduce transport costs in selected rail freight corridors and to strengthen institutional capacity at the Ministry of Transport and Infrastructure (MoTI) to deliver rail freight connectivity and manage rail-enabled logistics centers. The Project has three components. 1. Construction of Railway Branch Lines and Multimodal Connections at Priority Network Nodes component will finance the provision of last-mile rail connectivity at well-prioritized portions of the Turkish railway network. 1.1. Last-mile Multimodal Connectivity at Filyos Port subcomponent will finance 100 percent of civil works and 100 percent of engineering design review and construction supervision consulting services for the provision of rail and road connectivity at the last mile directly to/from the greenfield, large-scale maritime port of Filyos, on Turkey’s Black Sea coast, and its adjacent industrial zone. 1.2. Last-mile Rail Connectivity for Çukurova Region Industrial Zones and Iskenderun Bay Maritime Ports subcomponent will finance 100 percent of civil works and 100 percent of engineering design review and construction supervision consulting services for the construction of branch line rail links to/from selected operational and prospective industrial zones and free zones in the Çukurova region of South-Central Turkey on the Mediterranean Coast. 1.3. Provision of Last-mile Rail Connectivity at Additional Priority Sites to be Selected During Implementation subcomponent will finance 100 percent of civil works to provide last-mile rail connectivity to an additional 2 to 3 cargo generation-attraction nodes of similar nature as those targeted under Sub-components 1.1 and 1.2 that remain disconnected from the national railway network. 2. Feasibility Studies, Detailed Engineering Designs, Environmental and Social Documentation, and Construction Supervision for Rail Last-mile Connectivity Infrastructure at Additional Freight Nodes component will finance 100 percent of consulting services to produce Feasibility Study (FS) for 12 potential last-mile rail connectivity infrastructure subprojects at pre-identified freight generation attraction nodes currently disconnected from the national railway network. 3. Phase 2 COVID-19 (Coronavirus Disease 2019) Response Support, Institutional Strengthening, Capacity Building, and Project Implementation Support component will finance 100 percent of consulting services to provide technical assistance and capacity building in the following areas: (i) support to MoTI to diagnose the medium and long-term impacts of COVID-19 on multimodal logistics on the demand and supply sides, and design public, public-private, and/or purely private interventions, including interventions aimed to tackle behavioral and occupational aspects of risk prevention, to mitigate these impacts; (ii) support to Directorate-General of Infrastructure Investments (DGII) on the uniformization of rail technical standards across the national rail network; (iii) support to MoTI (DGII, Directorate-General of Transport Services Regulation-DGTSR, Directorate General of Turkish State Railways-TCDD) on the preparation of a strategy document for rail freight sector performance improvement; and (iv) support to TCDD through the development of an operational and management model for rail-enabled logistics centers specified within the framework of Turkey’s Logistics Masterplan and in line with Turkey’s 11th Development Plan, based on international best practice contextualized to the Turkish environment.

项目编号 P170532 · 入库编号 e6d4e2f0bc4c

同国别其他在执行项目

项目名称金额批准日期
Agriculture Sector Recovery in Türkiye's Earthquake-affected Provinces2.5 亿美元2024-12-11
Türkiye Preparedness for Public Health Emergencies Project2.5 亿美元2024-12-05
Eastern Türkiye Middle Corridor Railway Development Project6.6 亿美元2024-12-05
Additional Financing: Türkiye Irrigation Modernization Project9500 万美元2024-10-17
Türkiye Small Industrial Estates Reconstruction and Regional Economic Recovery Project6.0 亿美元2024-07-29

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。