Burundi Transport Resilience Project
一句话结论
这是一个位于布隆迪的港口类海外投资项目,当前阶段为在执行,批准金额 1.2 亿美元,批准日期 2022-09-30,由国际多边开发机构提供资金。项目编号 P172988。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 布隆迪(Burundi)
- 行业
- 港口
- 项目阶段
- 在执行
- 批准金额
- 120,000,000 美元(约 1.2 亿美元)
- 批准日期
- 2022-09-30
- 项目编号
- P172988
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objectives of the Transport Resilience Project for Burundi are to provide efficient, safe, and climate resilient road connectivity along the main corridor linking Burundi with Tanzania, and to strengthen the institutional capacity to sustainably plan, develop, and preserve climate resilient road assets. The project comprises of five components. The first component is climate resilient road rehabilitation and social services. It consists of following sub-components: (i) upgrading of selected critical roads to climate-resilient standards; and (ii) socio-economic infrastructures for climate-resilient communities. The second component, non-motorized transport and road safety improvements will support the Government of Burundi (GoB’s) ambitious target of reducing road deaths by 50 percent by 2030. It consists of following sub-components: (i) road safety management; (ii) safer roads and mobility; and (iii) pilot post-trauma care program. The third component is institutional strengthening for climate-resilient road infrastructure and logistics planning. It consists of following sub-components: (i) climate-resilient road infrastructure and logistics planning; (ii) climate-resilient low-carbon transport sector policy and planning support; (iii) first generation of climate-resilient transport specialists, and engineers’ registration board support; (iv) strengthening climate monitoring, prediction, and forecasting of hazards for road sector resilience and vulnerability assessments. The fourth component, project implementation support will finance project management activities such as the acquisition of office equipment, operating costs, audits, communications, monitoring, and evaluation (M and E) including that of the implementation of environmental and social aspects, as well as the establishment of a grievance redress mechanism (GRM). The fifth component, contingent emergency response component (CERC) will allow for reallocation of credit proceeds to provide immediate emergency recovery support following an eligible crisis or emergency involving road infrastructure.
项目编号 P172988 · 入库编号 ed2f8a232e89
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Burundi Colline Climate Resilience Project | 7000 万美元 | 2024-12-19 |
| BDI Human Capital Development Project | 2.0 亿美元 | 2024-07-22 |
| Urban Resilience Emergency Project | 1.1 亿美元 | 2024-07-01 |
| Accelerating Sustainable and Clean Energy Access Transformation in Burundi (ASCENT Burundi) | 1.0 亿美元 | 2024-06-26 |
| Cash for Jobs Additional Financing | 5000 万美元 | 2024-05-30 |
同行业其他项目
- Accelerating Transport and Trade Connectivity in Eastern South Asia – Bangladesh Phase 1 Project 2022-06-28
- Sao Paulo Metro Line 5 Project 2010-04-20
- Cameroon-Chad Transport Corridor 2022-02-15
- DRC Transport and Connectivity Support Project 2022-06-23
- Norte Grande Road Infrastructure 2010-12-20
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。