一句话结论
这是一个位于卢旺达的能源类海外投资项目,当前阶段为已关闭,批准金额 9500 万美元,批准日期 2015-12-14,由国际多边开发机构提供资金。项目编号 P150634。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 卢旺达(Rwanda)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 95,000,000 美元(约 9500 万美元)
- 批准日期
- 2015-12-14
- 项目编号
- P150634
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Electricity Sector Strengthening Project for Rwanda is to enhance the operational efficiency of the utility and increase electricity access. The project has three components: component A, electricity sector capacity strengthening; component B, increased access to electricity services; and component C, technical assistance and project implementation support. Component A will support EUCL to establish a comprehensive MIS to ensure efficient, transparent, and accountable processes covering network operations and maintenance (O&M); commercial functions; and management of corporate resources. The primary activities will include the design, supply, installation, and operationalization (including staff training) of an integrated MIS with several modules covering commercial, network operation, and corporate functions. Component B will support electricity connections of new consumers all over Rwanda and network reinforcements, where required, to ensure that network expansion does not compromise the quality of supply; and strengthening of the Kigali 15KV distribution network to provide sufficient capacity to meet increased demand from new economic activities. Kigali City and its environs constitute the biggest load center in Rwanda, currently consuming about 57 percent of the total energy supplied to the national grid. Component C will support studies to enhance sector performance and sector development, especially as related to grid supply and reliability, as well as providing support for project management and the SWG.
项目编号 P150634 · 入库编号 f199cd0c6ac6
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Boosting Green Finance, Investment and Trade in Rwanda | 2.0 亿美元 | 2024-12-20 |
| Priority Skills for Growth and Youth Empowerment | 2.8 亿美元 | 2024-09-09 |
| Rwanda Health Emergency Preparedness, Response and Resilience Project Using the Multiphase Programmatic Approach | 1.2 亿美元 | 2024-05-24 |
| Rwanda-Emergency Connectivity Restoration Project | 2736 万美元 | 2024-04-25 |
| Kigali Logistics Platform Connectivity Development Project | 1.3 亿美元 | 2024-03-29 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12