Mazar-e-Sharif Gas-to-Power Project
一句话结论
这是一个位于阿富汗的能源类海外投资项目,当前阶段为已关闭,批准金额 1200 万美元,批准日期 2019-10-10,由国际多边开发机构提供资金。项目编号 P157827。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 阿富汗(Afghanistan)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 12,000,000 美元(约 1200 万美元)
- 批准日期
- 2019-10-10
- 项目编号
- P157827
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Mazar-e-Sharif Gas to Power Project for Afghanistan is to increase the amount of reliable indigenous electricity generated and to mobilize private capital for Afghanistan. The project comprises the development, financing, design, construction and operation of a 58.6MW green-field Mazar-e-Sharif Gas-to-Power Project (the “Project”) on an independent power producer (IPP) basis. The power plant will be located at an industrial site about 20 km southwest of the city of Mazare-Sharif in the comparatively stable northwestern part of Afghanistan. It is expected to operate as a base-load power plant and serve North-East Power System (NEPS) consumers, which includes Kabul, Mazar-e-Sharif, and Jalalabad. The land at the industrial site, which is owned by Government of Afghanistan (GoA), is leased to the Project Company under a 25-years site lease agreement signed in June 2018. Construction of the Project will be undertaken under a turn-key Engineering, Procurement, and Construction (EPC) contract and the Commercial Operation Date (COD) is expected approximately 18 months after the start of construction. Operation and Maintenance (O&M) will be performed through a Joint Venture (JV) company which will be indirectly owned by Ghazanfar Neft & Gas DMCC (60 percent) and Mytilineos (40 percent). The Project Company is responsible for the implementation and operation of the Project under a 20-year take-or-pay Power Purchase Agreement (PPA). The proposed Project will be supplied with natural gas by Afghan Gas Enterprise (AGE), the state-owned gas facility operating under Ministry of Mines and Petroleum (MoMP). The proposed Project will be connected through a 180 km 220 kV overhead line between Mazare-Shaerif and Sheberghan currently under construction and is expected to be completed by November 2020, along with the Mazar-e-Sharif substation. Under the above-noted PPA, Da Afghanistan Breshna Sherkat (DABS) will be the sole off-taker of the power produced by the Project.
项目编号 P157827 · 入库编号 fd302cac75b1
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Education Emergency Response in Afghanistan Additional Financing | 7000 万美元 | 2024-12-12 |
| Additional Financing for the Afghanistan Community Resilience and Livelihoods Project | 8400 万美元 | 2024-04-30 |
| EMERGe | 1600 万美元 | 2024-03-28 |
| Additional Financing for Afghanistan COVID-19 Emergency Response and Health Systems Preparedness Project | 6000 万美元 | 2021-03-18 |
| Afghanistan Water, Sanitation, Hygiene and Institutional Support Project | 5000 万美元 | 2020-12-11 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12