Liberia Renewable Energy Access Project
一句话结论
这是一个位于利比里亚的能源类海外投资项目,当前阶段为在执行,批准金额 200 万美元,批准日期 2016-01-11,由国际多边开发机构提供资金。项目编号 P149683。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 利比里亚(Liberia)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 2,000,000 美元(约 200 万美元)
- 批准日期
- 2016-01-11
- 项目编号
- P149683
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objectives of the Renewable Energy Access Project for Liberia are to increase access to electricity and to foster the use of renewable energy sources. The project comprises of three components. The first component, decentralized electrification in Lofa County will support expansion of access to affordable, reliable, year-round electricity services to at about 50,000 people in North Lofa County, an economic and agricultural hub in North-West Liberia close to the border with Guinea and Sierra Leone. It consists of following three sub-components: (i) hydropower generation and hybrid mini-grid; (ii) thermal diesel generation; and (iii) technical assistance for decentralized electrification. The second component, technical assistance to strengthen rural electrification institutions and regulations will provide technical assistance to support the implementation of the Government of Liberia (GoL’s) program to expand decentralized electrification and foster the use of renewable energy. The third component, market development of stand-alone solar systems will finance the development of a national market for solar systems. It will help provide access to modern energy services to over 100,000 people. The component aims to support the development of the market by increasing the sustainability of the supply chain and by addressing demand-side constraints. It consists of following two sub-components: (i) import of stand-alone solar systems; and (ii) enabling environment for commercialization of stand-alone solar systems.
项目编号 P149683 · 入库编号 065285067f26
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Liberia First Resilient and Inclusive Growth Development Policy Financing | — | 2024-12-05 |
| Liberia Electricity Sector Strengthening and Access Project (LESSAP) Phase 2 | 4500 万美元 | 2024-06-24 |
| Governance Reform and Accountability Transformation (GREAT) Project | 3000 万美元 | 2024-06-12 |
| Rural Economic Transformation Project Second Additional Financing | 7600 万美元 | 2023-12-19 |
| Liberia Resilient Recovery Stand-alone DPF | 6500 万美元 | 2023-06-14 |
同行业其他项目
- First Low-Carbon Energy Programmatic Development Policy Loan 2023-06-29
- Second Additional Financing for Dasu Hydropower Stage I Project 2024-06-10
- Tarbela Fourth Extension Hydropower Project 2012-03-20
- Vishnugad Pipalkoti Hydro Electric Project 2011-06-30
- Pumped Storage Technical Assistance Project 2011-05-26
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。