中项目网图形标 中项目信息网海内+海外版

Pumped Storage Technical Assistance Project

国别:印度尼西亚行业:能源 阶段:已关闭 金额:6.4 亿美元 批准:
一句话结论

这是一个位于印度尼西亚的能源类海外投资项目,当前阶段为已关闭,批准金额 6.4 亿美元,批准日期 2011-05-26,由国际多边开发机构提供资金。项目编号 P112158。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
印度尼西亚(Indonesia)
行业
能源
项目阶段
已关闭
批准金额
640,000,000 美元(约 6.4 亿美元)
批准日期
2011-05-26
项目编号
P112158
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Upper Cisokan Pumped Storage (UCPS) Power Project for Indonesia is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity Perusahaan Listrik Negara (PLN) in hydropower planning, development and operation. There are three components to the project. The first component is development of the UCPS power plant: dam and appurtenant structures and access development, construction and operation of the UCPS Power Plant in West Java at the catchment of the Upper Cisokan River with an installed capacity of 1,040 MW(Megawatts), transmission lines: construction of two double circuit 500 kV transmission lines to connect the UCPS power plant to the existing Java-Bali power system at Cibinong- Saguling line provision of support for implementation of the above activities, including assistance in pre-construction engineering design, procurement, and construction management and supervision, and project administration: provision of support for project administrative activities to be conducted by the Project Implementation Unit (PIU); the second component is social and environmental impact management: land acquisition, resettlement and livelihoods restoration, and environment management; and the third component is feasibility study and preparation of basic design and bid documents for Matenggeng pumped storage power project, and related capacity building provision of support for the undertaking of a feasibility study and the preparation of basic design and bid documents for the future planned Matenggeng pumped storage project in Central Java with a planned installed capacity of approximately 880 MW, and provision of capacity building assistance to PLN for the planning, development and operation of hydropower projects, especially pumped storage hydropower projects.

项目编号 P112158 · 入库编号 79a3ad8f5522

同国别其他在执行项目

项目名称金额批准日期
Indonesia Supporting Health Transformation Project (I-SeHat)—2024-11-27
Integrated Land Administration and Spatial Planning Project6.5 亿美元2024-09-30
Technical Assistance Grant to Support SINERGIS Implementation—2024-04-22
Labor Market Information and Skills System Transformation for Labor Market Flexibility1.4 亿美元2024-01-18
Indonesia Health Systems Strengthening Project14.8 亿美元2023-12-08

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。