Vishnugad Pipalkoti Hydro Electric Project
一句话结论
这是一个位于印度的能源类海外投资项目,当前阶段为在执行,批准金额 6.5 亿美元,批准日期 2011-06-30,由国际多边开发机构提供资金。项目编号 P096124。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 印度(India)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 648,000,000 美元(约 6.5 亿美元)
- 批准日期
- 2011-06-30
- 项目编号
- P096124
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Vishnugad Pipalkoti Hydro Electric Project are: a) to increase the supply of electricity to India's national grid through the addition of renewable, low-carbon energy; and b) strengthen the institutional capacity of the borrower with respect to the preparation and implementation of economically, environmentally and socially sustainable hydropower projects. There are two components to the project. The first component is construction of the 444 MW Project in Chamoli district, Uttarakhand, India; and the second component is support to capacity-building and institutional strengthening at THDC India Limited, the developer of the Project.
项目编号 P096124 · 入库编号 74853a653aea
同国别其他在执行项目
同行业其他项目
- First Low-Carbon Energy Programmatic Development Policy Loan 2023-06-29
- Second Additional Financing for Dasu Hydropower Stage I Project 2024-06-10
- Tarbela Fourth Extension Hydropower Project 2012-03-20
- Pumped Storage Technical Assistance Project 2011-05-26
- Dasu Hydropower Stage I Project 2014-06-10
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。