Nurek Hydropower Rehabilitation Project Phase I
一句话结论
这是一个位于塔吉克斯坦的能源类海外投资项目,当前阶段为在执行,批准金额 2.3 亿美元,批准日期 2017-05-03,由国际多边开发机构提供资金。项目编号 P150816。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 塔吉克斯坦(Tajikistan)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 225,700,000 美元(约 2.3 亿美元)
- 批准日期
- 2017-05-03
- 项目编号
- P150816
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the First Phase of Nurek Hydropower Rehabilitation Project for Tajikistan are to rehabilitate and restore the generating capacity of three power generating units of Nurek hydropower plant, improve their efficiency, and strengthen the safety of the Nurek dam. There are three components to the project, the first component being rehabilitation of the three generating units, the key infrastructural components of the plant, and replacement of autotransformers. This component will consist of two sub-components: replacement and refurbishment of mechanical, electrical, and electromechanical equipment; and replacement of six autotransformers. The second component is the enhancement of dam safety. This component will finance activities to improve the safety of the operation of the Nurek HPP. The cost estimate for this component includes a provision for the possible mitigation measures that may be required. The cost of this component was estimated taking into account the maximum scope of activities, which may need to be implemented based on the results from ongoing seismic hazard assessment work. Therefore, the cost estimate includes a margin sufficient to implement all of the dam safety enhancement related activities, which will be required. Finally, the third component is the technical assistance. This component will support implementation of the project and strengthen the institutional capacity of BT by supporting the following: Project management consultant (PMC) to assist with the review of designs, bidding, quality control and construction supervision of the project. BT has already signed the US$5.2 million equivalent contract with PMC; (b) Panel of Experts (PoE) on matters related to dam safety and other critical aspects of the project; and (c) Technical and other engineering studies, which may be required during project implementation.
项目编号 P150816 · 入库编号 0dea7bb0d303
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Tajikistan Digital Foundations Project | — | 2024-12-17 |
| Sustainable Financing for Rogun Hydropower Project | 3.5 亿美元 | 2024-12-17 |
| Tajikistan Millati Solim Project | 4000 万美元 | 2023-10-24 |
| Financial and Private Sector Development Project | 5000 万美元 | 2023-07-10 |
| Social Protection Modernization and Economic Inclusion Project | 3500 万美元 | 2023-03-24 |
同行业其他项目
- First Low-Carbon Energy Programmatic Development Policy Loan 2023-06-29
- Second Additional Financing for Dasu Hydropower Stage I Project 2024-06-10
- Tarbela Fourth Extension Hydropower Project 2012-03-20
- Vishnugad Pipalkoti Hydro Electric Project 2011-06-30
- Pumped Storage Technical Assistance Project 2011-05-26
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。