中项目网图形标 中项目信息网海内+海外版

Climate Resilient Infrastructure

国别:伯利兹行业:港口 阶段:已关闭 金额:3000 万美元 批准:
一句话结论

这是一个位于伯利兹的港口类海外投资项目,当前阶段为已关闭,批准金额 3000 万美元,批准日期 2014-08-27,由国际多边开发机构提供资金。项目编号 P127338。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
伯利兹(Belize)
行业
港口
项目阶段
已关闭
批准金额
30,000,000 美元(约 3000 万美元)
批准日期
2014-08-27
项目编号
P127338
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objectives of the Climate Resilient Infrastructure Project for Belize are: (a) to enhance the resilience of road infrastructure against flood risk and impacts of climate change; and (b) to improve the borrower's capacity to respond promptly and effectively in an eligible crisis or emergency, as required. The project has four components. (1) Climate resilient infrastructure component will reduce physical vulnerability of critical infrastructure through the retrofitting and rehabilitation of existing infrastructure within the primary and secondary road network including associated drainage and flood mitigation systems in order to strengthen their resilience to natural hazards and the anticipated impacts of climate variability. (2) Technical assistance for improved climate resilience management component will strengthen the capacity of relevant technical line ministries, Ministry of Works and Transport (MoWT) and Ministry of Natural Resources and Agriculture (MNRA), to mainstream climate resilience considerations into core physical and investment planning and asset maintenance. The component will strengthen the capacity available to the MNRA and MoWT through targeted training, as well as equipment and knowledge acquisition. (3) Project management and implementation support component will support: (a) strengthening the project management unit and line ministries, through staffing, training, and operating costs; (b) preparation of project reports; (c) procurement and financial management; (d) coordination of participating line ministries; (e) compliance with social and environmental safeguards; (f) training of staff in project management and implementation technical support; (g) monitoring and evaluation of project progress and results; and (h) related activities to support efficient project management and implementation, through the provision of training, operating costs, and acquisition of goods. (4) Contingent emergency response component will provide support for immediate response to an eligible crisis or emergency, as needed.

项目编号 P127338 · 入库编号 0ec66f52450a

同国别其他在执行项目

项目名称金额批准日期
Climate Resilient and Sustainable Agriculture Project2500 万美元2022-03-14
Belize COVID-19 Response Project620 万美元2022-02-23

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。