Mali Electricity Sector Improvement Project (MESIP)
一句话结论
这是一个位于马里的能源类海外投资项目,当前阶段为在执行,批准金额 1.5 亿美元,批准日期 2019-06-21,由国际多边开发机构提供资金。项目编号 P166796。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 马里(Mali)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 150,000,000 美元(约 1.5 亿美元)
- 批准日期
- 2019-06-21
- 项目编号
- P166796
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Electricity Sector Improvement Project for Mali are to improve the reliability and efficiency of electricity supply in Bamako and the technical and commercial performance of EDM. The project is composed is of four components. Component 1 is to improve the transmission and distribution infrastructure of the National Power Utility (EDM). The objective of Component 2 is to strengthen the capacity of the EDM for day-to-day operations and provide targeted technical assistance to the EDM and other sector agencies. This support will be subdivided into two subcomponents – capacity strengthening and technical assistance. Component 3 will finance key actions under the EDM Restructuring Plan and EDM’s Management Improvement Plan (MIP) and improving the fuel delivery and storage system as well as the energy mix. Component 4 will support activities related to the integration of citizen engagement, improved customer engagement, and project management activities of the Project Implementation Unit (PIU) during the implementation period.
项目编号 P166796 · 入库编号 2e6fbd48cc31
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Mali Community Resilience and Inclusive Services Project - Malidenko | — | 2024-11-14 |
| Advancing Resilience and Inclusive Health Systems for Everyone (ARISE - KENEYA YIRIWALI) in Mali | — | 2024-06-28 |
| Mali Electricity System Reinforcement and Access Expansion Project (YELEN SIRA) | 1.6 亿美元 | 2023-06-23 |
| Mali Landscape Restoration Project | 1.5 亿美元 | 2023-05-25 |
| Bamako Urban Resilience Project | 2.5 亿美元 | 2022-11-30 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。