Zhengzhou Urban Rail Project
一句话结论
这是一个位于中国的港口类海外投资项目,当前阶段为已关闭,批准金额 2.5 亿美元,批准日期 2014-12-23,由国际多边开发机构提供资金。项目编号 P128919。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 中国(China)
- 行业
- 港口
- 项目阶段
- 已关闭
- 批准金额
- 250,000,000 美元(约 2.5 亿美元)
- 批准日期
- 2014-12-23
- 项目编号
- P128919
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Zhengzhou Urban Rail Project for China is to improve urban mobility for the population of Zhengzhou along the catchment area of Line 3 from Xin Liu Lu Station to Hang Hai Dong Lu Station. The project consists of the following four components: (1) Construction of Line 3. This component includes all construction activities for the Zhengzhou Urban Rail Line 3 (about 25.2 km) which starts at Xin Liu Lu station and ends at Hang Hai Dong Lu station. Line 3 will connect the city center of Zhengzhou with its northwest and southeast development areas. Line 3 includes 21 stations, which will be located underground and connected by tunnels. Six interchange stations to be constructed will provide convenient interchange with other urban rail lines. The Bank loan will support the construction of five stations and five tunnels located at the southeast end of the line. (2) Equipment for Line 3. This component includes equipment necessary to the operation of Line 3, such as rolling stock, power supply, control system, signaling system, communication system, monitoring system, fare collection system, safety and security system, ventilation and air conditioning system, water supply, sewerage and fire protection system, and station auxiliary equipment. This component will be financed entirely by local counterpart financing. (3) Design, Construction Management and Technical Assistance. This component includes: (i) activities for design and preparation of the project; (ii) activities for construction management and quality assurance; and (iii) technical assistance (TA) and capacity building of relevant staff and the Urban Rail Company (URC). The Bank loan will support the TA and capacity building activities. (4) Safeguards and Other Construction Costs. This component will include land acquisition and resettlement costs, construction site preparation (environmental mitigation measures) as well as other project related construction costs, such as engineering insurance, work safety assurance, inspection and acceptance, and project cost estimation. This component will be financed entirely by local counterpart financing.
项目编号 P128919 · 入库编号 41fb059351fb
同国别其他在执行项目
同行业其他项目
- Dar es Salaam Urban Transport Improvement Project 2017-03-08
- Douala Urban Mobility Project 2022-06-02
- Karachi Mobility Project 2019-06-27
- Support to the National Urban Transit Program Project 2011-07-21
- Central Africa Regional Waterways Project 2023-06-29
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。