Dasu Hydropower Stage I Project
一句话结论
这是一个位于巴基斯坦的能源类海外投资项目,当前阶段为在执行,批准金额 5.9 亿美元,批准日期 2014-06-10,由国际多边开发机构提供资金。项目编号 P121507。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 巴基斯坦(Pakistan)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 588,400,000 美元(约 5.9 亿美元)
- 批准日期
- 2014-06-10
- 项目编号
- P121507
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Dasu Hydropower Stage I Project (DHP-1) for Pakistan is to facilitate the expansion of electricity supply of hydropower in Pakistan. The Project will also improve access to socio-economic services for local communities in the project area and build the Water and Power Development Authoritys (WAPDAs) capacity to prepare future hydropower projects. This will be achieved by installing a 2,160 MW hydropower plant on the main Indus River, which can be expanded to 4,320 MW in future at very low cost. The Project is a "high-risk-high reward" operation aimed at providing low cost non-carbon renewable energy. This project comprises seven components. The first component, Construction of the Main Hydraulic Structure on the Indus River, will primarily consist of the civil works required for main dam structure on the Indus River to raise the water level and thus create energy for running the power generating turbines and generators. The second component, Power Generation Facilities, allows for the construction of power generating facilities, two head race tunnels, two tail race tunnels, powerhouse for housing the turbines and generators and ancillary works. The third component, Preparatory Works, includes access roads, Karakoram Highway (KKH) relocation, construction of 132 kV transmission line from Dubair to Dasu, offices, onsite housing, and possibly access tunnel to the power house. The fourth component, Transmission Line, will provide transmission of power, a double circuit 500kV line will be installed from Dasu to Islamabad (via Mansehra) that can serve two phases i.e. an installed capacity of 2,160 MW. The component will also include preparation and implementation of social, and environment management plans and supervision. The fifth component, Implementation of Social and Environmental Management Plans, and Glacial, Sediment River Monitoring, includes a Social and Resettlement Management Plan, Environmental Management Action Plan, and Flood warning system, watershed, sediment and river monitoring. The sixth component, Construction Supervision, Monitoring and Evaluation of the Project Impacts and Social and Environmental Management Plans, will cover the cost of construction supervision and will offer implementation support. Lastly, component seven, Project Management Support, Capacity Building of WAPDA, Technical Assistance and Training and Future Project Preparation and Strategic Studies, covers support costs. It also supports strategic studies that address technical, financial or management issues, mitigation measures, pilot projects and preparation of future projects.
项目编号 P121507 · 入库编号 47ec7ac03236
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Second Karachi Water and Sewerage Services Improvement Project (KWSSIP-2) | 2.4 亿美元 | 2024-12-12 |
| Sindh Livestock and Aquaculture Sectors Transformation Project | 1.4 亿美元 | 2024-06-20 |
| Crisis-Resilient Social Protection - Additional Financing | 4.0 亿美元 | 2024-06-20 |
| Getting Results: Access and Delivery of Quality Education Services in Punjab Project | 1.5 亿美元 | 2024-06-14 |
| Second Additional Financing for Dasu Hydropower Stage I Project | 10.0 亿美元 | 2024-06-10 |
同行业其他项目
- First Low-Carbon Energy Programmatic Development Policy Loan 2023-06-29
- Second Additional Financing for Dasu Hydropower Stage I Project 2024-06-10
- Tarbela Fourth Extension Hydropower Project 2012-03-20
- Vishnugad Pipalkoti Hydro Electric Project 2011-06-30
- Pumped Storage Technical Assistance Project 2011-05-26
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。