中项目网图形标 中项目信息网海内+海外版

Kandy Multimodal Transport Terminal Development Project

国别:斯里兰卡行业:港口 阶段:在执行 金额:6933 万美元 批准:
一句话结论

这是一个位于斯里兰卡的港口类海外投资项目,当前阶段为在执行,批准金额 6933 万美元,批准日期 2020-05-18,由国际多边开发机构提供资金。项目编号 P172342。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
斯里兰卡(Sri Lanka)
行业
港口
项目阶段
在执行
批准金额
69,330,000 美元(约 6933 万美元)
批准日期
2020-05-18
项目编号
P172342
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Kandy Multimodal Transport Terminal (KMMT) Development Project for Sri Lanka is to enhance accessibility, efficiency, and safety for public transport users of the Kandy Multimodal Transport Terminal. The Project has four components. 1. Development of Kandy Multimodal Transport Terminal will focus on: (a) Construction of a functional terminal building and bus parking facilities which are connected by an internal road; (b) Construction of 150-meter-long skywalk, allowing pedestrians to move safely between the railway station, hospital, and KMTT; (c) Development of pedestrian-friendly public space; (d) Construction of a diversion of Meda Ela, the urban storm water drainage canal, in order to facilitate the construction of the terminal. 2. Urban Integration and Road Safety Improvements around KMTT component will focus on: (a) Carrying out of (i) a study of possible pedestrian-friendly measures around KMTT and (ii) studies to explore transit-oriented development in the surrounding neighborhood; (b) Carrying out of a road safety improvement study from the perspective of engineering design, enforcement of policy, and public awareness. 3. Institutional Strengthening and Capacity Building component will focus on: (a) Preparing a business development plan for overall terminal management and operation which would (i) identify the best institutional arrangement for the management and operations of the KMTT and (ii) analyze financial options and explore potential for private sector participation in maintenance and operation of the KMTT; (b) Building capacity for key stakeholders involved in the management, operation and maintenance of the KMTT through the provision of training, technical assistance; (c) Support to the Project Management Unit (PMU), including the training of environmental and social requirements and procurement process. 4. Contingent Emergency Response Component will provide an immediate response to an Eligible Crisis or Health Emergency.

项目编号 P172342 · 入库编号 4f46e97f8014

同国别其他在执行项目

项目名称金额批准日期
Sri Lanka Second Resilience, Stability and Economic Turnaround Development Policy Operation4.0 亿美元2024-09-11
Sri Lanka: Primary Healthcare System Enhancing Project (PHSEP)1.5 亿美元2024-06-21
Financial Sector Safety Net Strengthening Project1.5 亿美元2023-11-09
Social Protection Project2.0 亿美元2023-06-28
Inclusive Connectivity and Development Project5.0 亿美元2021-09-30

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。