一句话结论
这是一个位于布隆迪的能源类海外投资项目,当前阶段为在执行,批准金额 1.0 亿美元,批准日期 2014-04-22,由国际多边开发机构提供资金。项目编号 P133610。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 布隆迪(Burundi)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 100,000,000 美元(约 1.0 亿美元)
- 批准日期
- 2014-04-22
- 项目编号
- P133610
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Jiji and Mulembwe Hydropower Project for Burundi is to increase the supply of clean and low cost hydropower electricity to Burundi's national grid. The project has three components. The first component, hydropower facilities and electricity services will finance the construction of the Jiji and Mulembwe hydropower facilities, the transmission line connecting the facilities to Bujumbura and to Bururi, new substations and extension of existing substations, and the electricity distribution network in the vicinity of the hydropower facilities. It has following six sub-components: (i) Jiji hydropower scheme; (ii) Mulembwe hydropower; (iii) substations; (iv) transmission lines; (v) electricity supply to communities; and (vi) social and environmental impacts mitigation. The second component, technical assistance; project management will enable agency for production and distribution of water and electricity (regie de production et de distribution d'eau et d'electricite) (REGIDESO) to sustainably maintain and operate the hydropower facilities of first component. It comprises of following five sub-components: (i) owner's engineer, panel for dam safety, and panel for supervision of environmental and social management plans (ESMPs) and resettlement action plans (RAPs) implementation; (ii) feasibility studies for new investments; (iii) technical support to the project implementing unit (PIU); (iv) operation of the PIU; and (v) equipment for the PIU. The third component, power sector reform and institutional development include three main sub-components: (i) expert support to ensure the sustainability of REGIDESO to support for the implementation of REGIDESO's restructuring along the lines recommended by the management audit prepared by external experts in 2013; (ii) reinforcement of the power sector regulator will finance international expertise to establish the electricity sector regulator, organize the regulation function, train the newly appointed staff, and prepare the procedures for interaction between the regulator, the ministry, REGIDESO, and future private investors; and (iii) implementation of government plan for the preparation of public private partnerships (PPPs) in the power sector will finance international expertise to support implementation of a framework for future PPPs.
项目编号 P133610 · 入库编号 619bb7ca8e70
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Burundi Colline Climate Resilience Project | 7000 万美元 | 2024-12-19 |
| BDI Human Capital Development Project | 2.0 亿美元 | 2024-07-22 |
| Urban Resilience Emergency Project | 1.1 亿美元 | 2024-07-01 |
| Accelerating Sustainable and Clean Energy Access Transformation in Burundi (ASCENT Burundi) | 1.0 亿美元 | 2024-06-26 |
| Cash for Jobs Additional Financing | 5000 万美元 | 2024-05-30 |
同行业其他项目
- First Low-Carbon Energy Programmatic Development Policy Loan 2023-06-29
- Second Additional Financing for Dasu Hydropower Stage I Project 2024-06-10
- Tarbela Fourth Extension Hydropower Project 2012-03-20
- Vishnugad Pipalkoti Hydro Electric Project 2011-06-30
- Pumped Storage Technical Assistance Project 2011-05-26
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。