中项目网图形标 中项目信息网海内+海外版

Peru Safe and Sustainable Transport Project

国别:秘鲁行业:道路 阶段:已关闭 金额:1.5 亿美元 批准:
一句话结论

这是一个位于秘鲁的道路类海外投资项目,当前阶段为已关闭,批准金额 1.5 亿美元,批准日期 2010-01-14,由国际多边开发机构提供资金。项目编号 P116929。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
秘鲁(Peru)
行业
道路
项目阶段
已关闭
批准金额
150,000,000 美元(约 1.5 亿美元)
批准日期
2010-01-14
项目编号
P116929
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Safe and Sustainable Transport Project is to improve passenger and freight transport conditions in an efficient and safe manner along national road corridors that are essential to Peru's competitiveness, in particular those included in the Government's stimulus package in response to the global crisis. There are five components to the project. The first component of the project is road rehabilitation, upgrading and Contracts of Rehabilitation and Maintenance Calendar Year (CREMA) pilot. This component will support the carrying out of rehabilitation and upgrading works for at least four national road corridors along the following sections which represent approximately 183 kilometers: Road Ayacucho-Abancay: section 50-98; Road Llama-Cochabamba; Road Cochabamba-Chota; and Road Puente Reither -Puente Paucartambo - Villarica. The second component of the project is road maintenance. This component will support the carrying out of Ministry of Transport and Communications (MTC's) outsourced, performance-based maintenance program, including: (a) periodic maintenance contracts on selected national roads; and (b) periodic maintenance activities included in mid-term, performance based, maintenance contracts on selected national paved or unpaved roads. The third component of the project is road safety infrastructure. This component will support the financing of priority civil works to improve road safety on national roads that have been selected for their high levels of road crashes, through the use of the International Road Assessment Program (iRAP) methodology, or any other methodology acceptable to the Bank. The fourth component of the project is institutional support and transport regulation. This component will support the provision of institutional support to strengthen the capacity of provias nacional to improve road asset management practices, bring innovation and build up its knowledge base, including: (i) the design and implementation of a bridge management system; (ii) the implementation of a pilot program on improving the right-of-way on national roads, and the revision o f the applicable normative framework; and (iii) the improvement of the existing system to handle road emergencies. The fifth component of the project is external auditing. This component will finance the financial external audits for the project.

项目编号 P116929 · 入库编号 72918505510b

同国别其他在执行项目

项目名称金额批准日期
Improving Lima Traffic Management and Supporting Sustainable Transport Project1.5 亿美元2024-10-15
Improving MIDIS’s Information Services within the National Targeting System (SINAFO) at the National Level Project5500 万美元2024-08-09
Peru First Fiscal Policy and Sustainable Growth DPF-DDO5.0 亿美元2024-08-09
Irrigation for Climate Resilient Agriculture1.0 亿美元2023-11-28
Peru: Enabling a Green and Resilient Development DPF - DDO II7.5 亿美元2023-10-26

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。