Western Economic Corridor and Regional Enhancement Program
一句话结论
这是一个位于孟加拉国的道路类海外投资项目,当前阶段为在执行,批准金额 5.0 亿美元,批准日期 2020-06-23,由国际多边开发机构提供资金。项目编号 P169880。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 孟加拉国(Bangladesh)
- 行业
- 道路
- 项目阶段
- 在执行
- 批准金额
- 500,000,000 美元(约 5.0 亿美元)
- 批准日期
- 2020-06-23
- 项目编号
- P169880
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the First Phase of Western Economic Corridor and Regional Enhancement Program for Bangladesh is to provide efficient, safe, and resilient connectivity along a regional transport corridor in western Bangladesh; and promote local economic development in the hinterland of the corridor. The project has five components. 1. Upgrading the National Highway Corridor and Enhancing Digital Connectivity component will be implemented by Roads and Highways Department (RHD) and support the following: (a) Upgrading the Section from a two-lane single carriageway to a climate-resilient four-lane dual carriage way with a service lane on each side; (b) (i) supporting the design of a climate-resilient optical fiber cable (OFC) system and intelligent transport system (ITS) for the Program Corridor; and (ii) supporting the installation, and operations and maintenance of the climate-resilient OFC system and the ITS; (c) (i) supporting the design of a pilot safe corridor demonstration program (SCDP) for the Section; and (ii) supporting the implementation of the SCDP along the Section; (d) supporting studies, assessments, surveys, and data collection in relation to, inter alia, the feasibility, design, supervision, and technical aspects of the activities listed in (a) to (c) above, with respect to the Program Corridor or Section, as applicable. 2. Upgrading Secondary and Tertiary Roads; and Complementary Logistics Infrastructure and Services component will be implemented by Local Government Engineering Department (LGED) and support the following: (a) Supporting, in the Project Districts: (i) the development and upgrading of complementary logistics infrastructure; and (ii) the provision of relevant services; and (b) Upgrading around 600 kilometers of selected priority village roads, Upazila roads and Union roads, serving selected markets in the Project Districts, to all weather climate-resilient roads. 3. Project Implementation Support and Sustainability component will be implemented by both RHD and LGED and will support the following: (a) Providing training and supporting capacity building activities of RHD and LGED, and industry stakeholders on selected priority areas and Project management; (b) Carrying out a Strategic Environmental and Social Assessment; (c) Supporting the establishment of a Fiduciary Advisory Consultant Panel (FACP); (d) Supporting the establishment of a Road Transport Sector Integration and Coordination Platform (RTSICP), and supporting the implementation of the Road Maintenance Fund Board Act; and (e) Providing support for preparatory activities for subsequent Multiphase Programmatic Approach (MPA) Program phases. 4. COVID-19 Relief and Recovery component will be implemented by both RHD and LGED and will support the following: (a) Designing and implementing a program to foster employment opportunities for vulnerable local populations; (b) Supporting the development and dissemination of an emergency response plan for COVID-19 for RHD and LGED; and (c) Supporting the provision of necessary upgrades at RHD and LGED offices to ensure business continuity and improve work environment safety. 5. Contingent Emergency Response Component (CERC) will provide immediate response to an Eligible Crisis or Emergency, as needed.
项目编号 P169880 · 入库编号 746177760525
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Chattogram Water Supply Improvement Project | 2.8 亿美元 | 2024-12-19 |
| Health, Nutrition and Population Sector Development Program | 3.8 亿美元 | 2024-12-19 |
| Second Bangladesh Green and Climate Resilient Development Credit | 5.0 亿美元 | 2024-12-19 |
| Bay Terminal Marine Infrastructure Development Project | 6.5 亿美元 | 2024-06-28 |
| Bangladesh Second Recovery and Resilience DPC | 5.0 亿美元 | 2024-06-21 |
同行业其他项目
- PMGSY Rural Roads Project 2010-12-20
- Bangladesh Padma Multipurpose Bridge Project 2011-02-24
- East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - 1b) 2012-05-01
- Center West Regional Development Corridor 2016-06-09
- Horn of Africa Gateway Development Project 2020-09-08
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。